Installing battery cables (rack-mounted, rear view)
Busbar mounting
hole dimensions
(unit: mm)
Scenario 2
Installing Cables for Parallel UPSs
•
Before parallel running, ensure that all output circuit breakers for each UPS are ON.
Otherwise, a UPS fault (error code #72) will occur.
•
Batteries must be connected for parallel running.
All manuals and user guides at all-guides.com
6