NoiseKen FNS-AX4-A20-N2447 Instruction Manual

Fast transient burst simulator
Table of Contents

Advertisement

Quick Links

INSTRUCTION MANUAL
FAST TRANSIENT BURST SIMULATOR
FNS-AX4-A20-N2447
NOISE LABORATORY CO., LTD.
Edition1.00
AEH00230-00E-0

Advertisement

Table of Contents
loading

Summary of Contents for NoiseKen FNS-AX4-A20-N2447

  • Page 1 INSTRUCTION MANUAL FAST TRANSIENT BURST SIMULATOR FNS-AX4-A20-N2447 NOISE LABORATORY CO., LTD. Edition1.00 AEH00230-00E-0...
  • Page 2 NOTICE The contents of this instruction manual (the “Manual”) are subject to change without • prior notice. No part of the Manual may be reproduced or distributed, in any form or by any means, • without the authorization of Noise Laboratory Co., Ltd. (the “Company”). The contents of the Manual have been thoroughly examined.
  • Page 3 The following instructions are very important for safe handling of the fast transient burst simulator FNS-AX4-A20-N2447(hereinafter “the Unit”). They must be kept strictly to prevent users of the Unit from receiving harm or damage through using the Unit. Read them carefully before use.
  • Page 4 2. CONTENTS IN PACKAGE The following items are enclosed in the package. Check them when opening the package. Description Quantity A: Main unit ————————————————————————————————————————————————————— 1 B: SG cable (0.1 m) —————————————————————————————————————————— 1 05-00103A C: AC cord ————————————————————————————————————————————————————— 1 D: Line input cable (2 m) 05-00151A RED 1、Black 1、Green / Yellow 1 ———————————————...
  • Page 5 3. APPLICATION FORM FOR INSTRUCTION MANUAL We place an order for an instruction manual. Model: FNS-AX4-A20-N2447 Serial No.: Applicant: Company name: Address: Department: Person in charge: Tel No.: Fax No. Cut off this page “APPLICATION FORM FOR INSTRUCTION MANUAL” from this volume and keep it for future use with care.
  • Page 6 Memorandum...
  • Page 7 4. PREFACE 4-1. Preface We thank you very much for your purchase of our Fast Transient Burst Simulator FNS-AX4-A20-N2447 (hereinafter “the Unit”). This instruction manual (“the Manual”) contains how to use the Unit and other important information. In order to obtain the highest performance from the Unit, thoroughly understand the contents of the Manual and use as ready reference for operation.
  • Page 8 5. TABLE OF CONTENTS 1. IMPORTANT SAFETY PRECAUTIONS ..............1 2. CONTENTS IN PACKAGE ..................2 3. APPLICATION FORM FOR INSTRUCTION MANUAL ..........3 4. PREFACE ........................5 4-1. P —————————————————————————————————————————————————————————————————————————————————————————————— 5 REFACE 4-2. F —————————————————————————————————————————————————————————————————————————————————————————————— 5 EATURE 5. TABLE OF CONTENTS ..................... 6 6.
  • Page 9: Table Of Contents

    5. TABLE OF CONTENTS 10-5. C —————————————————————————————————————————————————————————————— 29 ONNECTING OUPLING LAMP 10-3. C ——————————————————————————————————————————————————————————————————————— 30 ONNECTING NPUT 10-4. C ) ————————————————————————————————————————————————— 32 ONNECTING UTPUT OWER 11. OPERATION ......................34 11-1. T ON FNS-AX4 ———————————————————————————————————————————————————————————————————————————— 34 11-2. E ——————————————————————————————————————————————————————————————————— 34 MERGENCY UTTON How to cancel emergency stop ....................
  • Page 10 5. TABLE OF CONTENTS Load ............................60 Delete ............................60 13-4. E ————————————————————————————————————————————————————————————————————— 61 XECUTING ANUAL 14. SETTING UP SEQUENCE TEST ................65 14-1. M ———————————————————————————————————————————————————————— 66 AKING EQUENCE XECUTION 14-2. S ———————————————————————————————————————————————————————— 68 AVING EQUENCE XECUTION Save ............................69 Load ............................
  • Page 11 5. TABLE OF CONTENTS Waveform Verification with 50 Load (In Case of Using 00-00017A) ........87 Waveform Verification with 1k Load (In Case of Using 00-00018A) ........87 ) ——— 89 21-2. V EUT LINE OUT(W 50 L ERIFICATION AT AVEFORM ERIFICATION WITH 21-3.
  • Page 12 6. BASIC SAFETY PRECAUTIONS The following items are very important instructions which users must follow to take precautions against possible injury and harm. The indications are provided as an explanation of potential danger involved if the safety precautions are not observed correctly. 6-1.
  • Page 13 6. BASIC SAFETY PRECAUTIONS The contents of following signs indicate warnings and cautions when using the Unit. Noticing possibility of an electric shock It indicates that there is possibility of an electric shock. Noticing caution, warning and danger It indicates that there is a possibility of harm or physical damage if the Unit is or related equipment is handled incorrectly and that the Manual should be referred.
  • Page 14 6. BASIC SAFETY PRECAUTIONS 6-3. Danger Do not take the Unit apart or do not remodel. Do not open the cover. Imminent danger might occur resulting in death or serious injury. Repair, internal adjustment, and inspection of the Unit should be performed by a qualified service Do not engineer.
  • Page 15 6. BASIC SAFETY PRECAUTIONS Do not supply over-rating power to EUT Line input terminal. Do not supply over-rating power to EUT line. The misuse may cause a damage of equipment or a fire. The rating of input is; A20: Maximum voltage: AC240 V, DC125 V, Maximum current 20 A (PE line: 10 A);...
  • Page 16 6. BASIC SAFETY PRECAUTIONS Do not use the attached AC cord for any other purpose. The misuse may result in a fire or an electric shock. Do not damage AC cord. A damaged AC cord may cause a fire or an electric shock. For HV cable, be sure to take notice following points.
  • Page 17 6. BASIC SAFETY PRECAUTIONS When the body is dirty, wipe the body with a dry cloth. Do not wipe the Unit and Probe with thinner, alcohol or other solvent. When the body is very dirty, soak a cloth into neutral detergent, squeeze out the detergent from the cloth and wipe the body with the cloth.
  • Page 18 7. CAUTION ABOUT EXPENDABLE SUPPLIES About a high voltage relay inside A high voltage relay used inside is an expendable component. The lifetime of it is dependent on using conditions and environment. If a symptom which seems to be caused by an exhausted high voltage relay, e.g. unstable current value, unstable repetition cycle or so on, is found, contact Noise Laboratory or your closest sales agent of Noise Laboratory.
  • Page 19 8. INTRODUCTORY NOTES 8-1. Introductory Notes The meaning of following symbols is as follows. Operate the touch panel. Additional explanation. Indicating other parts to be referred in the Manual. Indicating restriction of setting up. Indicating items to be confirmed before usage. 【...
  • Page 20 8. INTRODUCTORY NOTES 8-3. Characteristics of Burst Generator The burst waveform output by the Unit is shown as Fig. 8-1. The waveform of single pulse is prescribed with 50Ω load and 1kΩ load, shown as Fig, 8-2. PULSE BURST Output timing prescribed in IEC 61000-4-4 Pulse frequency 5 kHz 100 kHz...
  • Page 21 8. INTRODUCTORY NOTES 8-4. Block Diagram of FNS-AX4 Pulse generator BURST GENERATOR PULSE OUT (50Ω coaxial) HVPS to CDN from BURST GENERATOR CDN (A20) EUT LINE IN Contactor EUT LINE OUT terminal (EUT LINE SW) terminal Ferrites SG trminal from BURST GENERATOR CDN (B63) EUT LINE IN EUT LINE OUT...
  • Page 22 8. INTRODUCTORY NOTES 8-5. Examle of Test IEC 61000-4-4 prescribes test to check immunity of EUT against burst noise occurred in various kind of situation e.g. on cutoff of electromagnetic switches. Burst noise is applied to EUT via power lines or signal lines.
  • Page 23 8. INTRODUCTORY NOTES Example of Test to Signal Line Put the Unit (FNS-AX4) on ground plane (ground reference plane) which is connected to protective earth and connect SG terminal of the Unit to ground plane. Set coupling clamp on ground plane and connect GND of coupling clamp to ground plane. Connect coupling clamp to pulse out connector of the Unit.
  • Page 24 9. APPEARANCE AND FUNCTION OF EACH PART 9-1. Appearance of The Main Unit Rear Panel Output panel Control panel A20 type type type type B63 type type type type...
  • Page 25 9. APPEARANCE AND FUNCTION OF EACH PART 9-2. Control Panel 1 1 1 1 2 2 2 2 3 3 3 3 5 5 5 5 4 4 4 4 6 6 6 6 8 8 8 8 7 7 7 7 1.
  • Page 26 9. APPEARANCE AND FUNCTION OF EACH PART 9-3. Output panel 9 9 9 9 9. 9. 9. 9. EUT line output terminals 【EUT LINE OUTPUT】 EUT line output terminal of L1/L2/L3/N/PE(B63) or L/N/PE(A20). The EUT shall be connected to EUT LINE OUTPUT ports by using the supplied line output cables The EUT LINE OUTPUT and the accessory cables adopt Snap-in lock system connector by Staubli Electrical Connectors AG.
  • Page 27 9. APPEARANCE AND FUNCTION OF EACH PART SG terminal 【SG】 Signal ground which becomes a return loop of high voltage pulse. Connect it to ground plane with the attached SG cable. Pulse out connector 【PULSE OUT】 Coaxial connector outputting high voltage pulse. Coupling clamp is connected to this connector. High voltage pulse is output on test.
  • Page 28 9. APPEARANCE AND FUNCTION OF EACH PART 9-4. Rear Panel Used to radiate internal heat. Avoid blocking ventilation. Communication port for servicing 【EXCLUSIVE USE】 Connector dedicated only to maintenance/servicing. Do not remove cover. Warning lamp/pilot lamp port【INDICATOR】 An optional waring lamp or tri-color pilot light can be connected. For details please refer to 17-2 Connection of an indicator Optical communication connector 【REMOTE】...
  • Page 29 9. APPEARANCE AND FUNCTION OF EACH PART EUT line input terminal 【EUT LINE INPUT】 Safety sockets used for inputting power supply for EUT. EUT line of the Unit does not have any protection circuit against over voltage or over current. Prepare a proper protection circuit separately.
  • Page 30 10. CONNECTION 10-1. Connecting AC Cord Insert a proper AC cord into AC inlet【AC INPUT】. The attached AC cord is for AC100~120 V. In case of AC220~240 V, prepare a 3-line AC cord with PE terminal pin which is conforming to the local safety standard. 10-2.
  • Page 31: Connecting Coupling Clamp

    10. CONNECTION 10-5. Connecting Coupling Clamp Connect coupling clamp (option) to the Unit. For configuration of equipment, refer to the instruction manual of coupling clamp. Make sure that the Unit is in OFF status. Connect the coaxial cable of the coupling clamp to pulse out connector 【PULSE OUT】on front panel of the Unit.
  • Page 32: Connecting Line Input

    10. CONNECTION 10-3. Connecting Line Input Connect EUT power supply to the Unit. The EUT supply connection shall be made by using the included LINE INPUT cables. • The cables have the following colors for easier identification. Use within the specified •...
  • Page 33 10. CONNECTION A20 type DC DC DC DC Single Single- - - - phase (AC) phase (AC) Single Single phase (AC) phase (AC) B63 type When B63 type is used to test either single phase AC or DC operated EUT, EUT connection shall be made at EUT LINE INPUT marked【AC 1PHASE】...
  • Page 34: Connecting Line Output

    10. CONNECTION 10-4. Connecting Line Output (Power Line) Connect line output cables. The points to be paid attention to are the same as connection of line input. Follow the instruction on the panel of the Unit. Make sure that power supply to EUT is cut off and the Unit is in OFF status. 【EUT LINE OUTPUT】...
  • Page 35 10. CONNECTION A20 type Single-phase (AC) B63 type Single-phase 3-phase 5 line(AC) The EUT side of the LINE OUTPUT cables is with an M6 solderless terminal.
  • Page 36: Operation

    11. OPERATION 11-1. Turn ON FNS-AX4 1 1 1 1 Turn on the Unit with POWER switch on front panel of the Unit. 2 2 2 2 When the Unit is turned on and starts normally, an electronic sound goes off, main menu is displayed on LCD touch panel, and a fan in rear side starts working.
  • Page 37: Main Menu

    11. OPERATION 11-3. Main Menu The Unit adopts touch panel type LCD which enables image-oriented operation with graphic display. When main menu is displayed, touch the panel to select a function to be used. As main menu is always displayed when MENU switch is pressed, moving to another screen is easy. (This function is unavailable while conducting test.) Manual test mode Standard test mode...
  • Page 38: Screen Flowchart ———————————————————————————————————————

    11. OPERATION 11-4. Screen Flowchart Standard test mode(POWER LINE ⇔ SIGNAL LINE) Main menu Manual test mode CDN setting screen Sweep setting sceen CDN sweep setting screen Title operation screen Special function setting screen Sequence test mode Sequence title operation screen UTIL1 UTIL2 UTIL3...
  • Page 39: Inputting Numbers And Letters

    11. OPERATION 11-5. Inputting Numbers and Letters (About Ten Key and Character Key) Ten key is displayed for inputting numbers, character key is displayed for operation for title. Basic operations of them are as follows. Touch the item to be input to display ten key. Ten key will be displayed with the value as before. [Title of input items] Indicates pulse voltage, pulse frequency, burst duration, burst period, etc.
  • Page 40: Setting Up Standard Test

    12. SETTING UP STANDARD TEST Touch『STANDARD』on main menu. In Standard test mode, the test levels shown on Table 12-1, 12-2 are available. If any other test condition than followings is needed, set with Manual test mode. Select 『 POWER LINE』 to conduct tests using CDN for power lines or PE, and 『SIGNAL LINE』 to conduct tests using coupling clamp for I/O port, data port, or control port.
  • Page 41 12. SETTING UP STANDARD TEST Output Indicates which high voltage pulse outputs to, CDN or Pulse out. CDN coupling Selects which line high voltage pulse couples to. (This column is not indicated on SIGNAL LINE screen) Touch test level. Select Standard test setting screen , or Polarity...
  • Page 42: Selecting Coupling Line

    12. SETTING UP STANDARD TEST Selecting Coupling Line Select『POWER LINE』or『SIGNAL LINE』with tabs upper left on the screen. Coupling high voltage pulse to power line (POWER LINE) Touch『POWER LINE』upper left tab. Pulse is set to output to line output terminal block on front panel【EUT LINE OUTPUT】. Touch the phase to be coupled.
  • Page 43: Executing Standard Test

    12. SETTING UP STANDARD TEST 12-1. Executing Standard Test Power supply to EUT In case of test to power line, press EUT LINE switch 【EUT LINE】 on control panel to connect the line. LED of EUT LINE switch is alight when power is supplied. As power is supplied to line output terminal block 【...
  • Page 44 12. SETTING UP STANDARD TEST Conducting test 『UNDER TEST』 is indicated upper right on the screen. While test is being conducted, START switch is alight and warning lump is blinking. High voltage pulses are output. Mishandling or careless operation may result in a fatal wound. Carefully handle it.
  • Page 45 12. SETTING UP STANDARD TEST Completion of test Test is completed automatically when the set time has passed. START switch lights off and『Test completed.』Is indicated upper right on the screen. Confirming completion, touch to return to Standard test setting screen. Starting test again on this screen is not available.
  • Page 46: Setting Up Manual Test

    13. SETTING UP MANUAL TEST Touch『MANUAL』on main menu. ☆ Title Manual test setting screen CDN setting screen List of icons for operation Icon of key Remarks Used for setting up special function. If any special function is set, ↕ indicated. →For details, refer to “13-2. Special Functions” (P. 52). Used for switching from one to another between Manual test setting screen and Sweep setting screen.
  • Page 47: Selecting Polarity

    13. SETTING UP MANUAL TEST Selecting Polarity Touch Setting Pulse Voltage Touch the column of voltage. Input value and fix it with “Enter”. 120V~5000V 10V step Setting Pulse Frequency Touch the column of pulse frequency. Input value and fix it with “Enter”. 0.1kHz~10kHz 0.01kHz step 10kHz~100kHz 1kHz step 100kHz~1000kHz 10kHz step...
  • Page 48: Setting Number Of Pulse

    13. SETTING UP MANUAL TEST Setting Number of Pulse Touch the column of pulse count. Input value and fix it with “Enter”. 1~1000 1 step The number of pulses (pulse count) is less than 1 piece of pulse per 1 ms of burst period. (If burst period is 300ms, the maximum number of pulses is 300pieces.) If burst duration is changed, pulse count will be recalculated.
  • Page 49 13. SETTING UP MANUAL TEST Summary of setting burst Pulse count is less than 1 per 1 ms of burst period. Burst duration = Pulse count / Pulse frequency Burst duration < Burst period Ex. 1) U U U U Npmax Np: Pulse count Npmax: Max.
  • Page 50: Selecting Cdn Out Or Pulse Out

    13. SETTING UP MANUAL TEST Selecting CDN Out or Pulse Out Touch is touched, CDN setting screen is indicated. Setting Coupling Way for CDN Coupling Touch to indicate CDN setting screen. On this screen, coupling phase and phase angle synchronization can be set. If CDN is already selected and the setting screen is not indicated, touch to indicate the CDN setting screen.
  • Page 51 13. SETTING UP MANUAL TEST Example of AC line synchronized output (1) Phase angle: 90° T=20ms(AC50Hz) :AC line cycle :Burst duration :Burst period After outputting under the condition of the specified burst duration and period, the next burst is output again on the next synchronized timing of AC line.
  • Page 52: Setting Test Time

    13. SETTING UP MANUAL TEST Setting CDN coupling phase Select phases to be coupled and touch the phase. In single-phase model (A20), select from In 3-phase model (B63), select from Single-phase model (A20) 3-phase model (B63) 3-phase model (B63) (Single-phase mode) Simultaneous coupling to all lines versus ground reference plane is prescribed in IEC •...
  • Page 53: Sweep Mode

    13. SETTING UP MANUAL TEST 13-1. Sweep Mode A test with using the sweep function is useful to check malfunction level of EUT because, with this function, tests can be conducted one after another with changing test parameters step by step and varying sets of polarity and coupling phase.
  • Page 54: Setting Polarity Sweep

    13. SETTING UP MANUAL TEST Setting Polarity Sweep If polarity sweep is set, the test is conducted in order of positive (+) → negative (-). Touch check box of polarity ( ). To release the status, touch the box again or touch polarity button to select polarity.
  • Page 55: Setting Cdn Sweep

    13. SETTING UP MANUAL TEST Setting CDN Sweep Touch on Sweep setting screen to indicate CDN sweep setting screen. On this screen, line phase angle synchronization sweep and CDN coupling phase sweep can be set. If CDN is already selected and the setting screen is not indicated, touch to indicate the CDN setting screen.
  • Page 56: Special Functions ———————————————————————————————————————&#X

    13. SETTING UP MANUAL TEST 13-2. Special Functions A test with using special functions is effective to reproduce EUT’s malfunctions in the field. Touch upper right on Manual test setting screen to indicate Special function setting screen. Some of functions cannot be set if conditions on the former screen are not enough. When the set up completes and the screen returns to Manual test setting screen, turns to and ○...
  • Page 57: Setting Continuous Output

    13. SETTING UP MANUAL TEST Setting Continuous Output Burst can be output continuously irrelevant to burst period with the continuous output function. Touch ON/OFF of CONTINUOUS. The following conditions are necessary to make the continuous output function effective. Available pulse frequency is limited according to voltage value. Set them within the following range. •...
  • Page 58: Setting Frequency Modulation

    13. SETTING UP MANUAL TEST Setting Frequency Modulation Pulse frequency can sway within a range of about 10% of the set value with the frequency modulation function. As the swayed pulse frequency has less possibility to synchronize the clock of EUT than usual pulse frequency, it is more expected to reproduce EUT’s malfunctions.
  • Page 59: Setting External Trigger

    13. SETTING UP MANUAL TEST Setting External Trigger Burst can be output synchronized with an external signal. When a signal is input to the external trigger connector on control panel【EXT TRIG IN】, the set burst is output. Touch ON/OFF of EXTERNAL TRIGGER. The interface for inputting a trigger signal is shown on the figure as below.
  • Page 60: Title Save / Load

    13. SETTING UP MANUAL TEST 13-3. Title Save / Load The set up test contents can be saved with naming a title. Saving 30 kinds of sets is available and each title can include 12 or less roman letters, digits. Select a title box and select『LOAD/DEL/ SAVE』. Touch , upper right on Manual test setting screen or Sweep setting screen, or touch『LOAD』...
  • Page 61: Save

    13. SETTING UP MANUAL TEST Save Touch a title box for saving and touch to indicate character key. Input a title and fix it with Enter. Ex.) Save a new file as TEST 01. “TEST 01” is indicated. Touch a box. Input “TEST 01”.
  • Page 62: Load

    13. SETTING UP MANUAL TEST Load Load means calling the saved titled file to use it for manual test set up. Touch the title box to be called. Touch to call the saved test contents. If there is another set up in editing on Manual test setting screen, a check box as below appears before start loading.
  • Page 63: Executing Manual Test

    13. SETTING UP MANUAL TEST 13-4. Executing Manual Test Power supply to EUT In case of test to power line, press EUT LINE switch 【EUT LINE】 on control panel to connect the line. LED of EUT LINE switch is alight when power is supplied. As power is supplied to line output terminal block【EUT LINE OUTPUT】when EUT LINE switch is turned ON, carefully handle the Unit and all related equipment.
  • Page 64 13. SETTING UP MANUAL TEST Check screen when “SWEEP” is set Pulse frequency sweep Pulse voltage sweep Phase angle sweep (When『synchronization』 is selected) CDN Coupling phase sweep When SWEEP of pulse voltage, pulse frequency, or phase angle is set, start value, stop value, and step value are indicated in the bottom column.
  • Page 65 13. SETTING UP MANUAL TEST Pause Pressing START switch while conducting test makes the output pausing. START switch is blinking and 『PAUSE』is indicated upper right on the screen. For restarting the test, press START switch again. If『PAUSE』status is left as is for 90 seconds, the test will be stopped automatically for safety. Suspension Pressing STOP switch while conducting test makes the test stop at the moment.
  • Page 66 13. SETTING UP MANUAL TEST Moving to next test In case of conducting a sequence test or a test set Sweep function, the following message is indicated when moving set up from one to another. While this message is indicated, electricity is eliminated in the internal high voltage circuit.
  • Page 67: Setting Up Sequence Test

    14. SETTING UP SEQUENCE TEST Touch『SEQUENCE』on main menu. 『SEQUENCE』is the function to conduct test contents one after another which are saved on Manual test setting screen. Maximum 18 titles of settings can be formed into one sequence. The made up sequence can be saved as “sequence title”.
  • Page 68: Making Sequence Execution List

    14. SETTING UP SEQUENCE TEST 14-1. Making Sequence Execution List Touch one of the columns of the sequence execution list to select the column to be inserted into. (The sequence execution list has 3 pages. Touch to scroll.) Touch one of the titles of the title list to select the title to add the sequence execution list. (The title list has 5 pages.
  • Page 69 14. SETTING UP SEQUENCE TEST Deleting a title from the sequence execution list Touch the column to delete and touch Changing execution order Touch the column to move up or down and touch Deleting the whole of an execution list Touch .
  • Page 70: Saving Sequence Execution List

    14. SETTING UP SEQUENCE TEST 14-2. Saving Sequence Execution List The set up sequence can be saved with naming a title. Saving 15 kinds of sequence is available and each title can include 12 or less roman letters, digits. Character key is indicated in inputting a title. For details of character key, refer to P.37.
  • Page 71: Save

    14. SETTING UP SEQUENCE TEST Save Touch the sequence title box to be saved and touch to indicate Character key. Input a title and fix it with Enter. Ex.)Save a new sequence title as AUTO 01. Touch a box. Input “AUTO 01”. “AUTO 01”...
  • Page 72: Load

    14. SETTING UP SEQUENCE TEST Load Load means calling the saved sequence title to use it for sequence test set up. Touch the title box to be called. Touch to call the saved sequence title. If there is another set up in editing on Sequence test setting screen, a check box as below appears before start loading.
  • Page 73: Executing Sequence Test

    14. SETTING UP SEQUENCE TEST 14-3. Executing Sequence Test Sequence test can start on Sequence setting screen. If the sequence test execution list has any title, the start of the sequence test is available. Operation and matters requiring attention for testing are similar to Manual test.
  • Page 74: Utility

    15. UTILITY Touch『UTILITY』on main menu. Some items which are not related with test parameters directly can be set as you like depending on situation on Utility screen. Utility screen has 3 screens (UTIL1,UTIL2,UTIL3). Touch an icon on the left on the screen to switch the screen. UTIL 1 UTIL 1 UTIL 1...
  • Page 75: Burst Alarm Beep

    15. UTILITY Burst Alarm Beep Selects whether an alarm sound beeps or not when test is conducted. Touch『UTIL 1』→『BURST ALARM BEEP』 Touch check box ( ) Beeps in outputting No beep OFF is selected as a default value on shipment. Power ON Display Selects the farst screen indicated when the Unit is turned ON.
  • Page 76: Sequence Method

    15. UTILITY Sequence Method Selects how to switch to the next stage when sequence test is selected. Touch『UTIL 2』→『SEQUENCE METHOD』 Touch the check box ( ) depending on your need. The next test is conducted The next test will start automatically.
  • Page 77: Pre Check

    16. PRE CHECK The PRECHECK function is provided for the users to easily check whether pulse outputs are available at the selected port (the port being checked). It is recommended that PRECHEK is done every time before testing is done. PRECHECK provides pass or fail results but this should not be considered a calibration of the simulator.
  • Page 78 15. UTILITY Ports connection and performing a PRECHCK Connect the selected port (PULSE OUT/either of EUT LINE OUTPUT) to PRECHECK IN port by using waveform verification connector and the coaxial cable. CDN (EUT LINE OUT) PULSE OUT CDN waveform verification connector Coaxial cable Coaxial cable Press the START switch to execute the pre-check.
  • Page 79: Other Functions

    17. OTHER FUNCTIONS 17-1. EUT FAIL Function With inputting a signal to EUT FAIL terminal, control, such as stopping or pausing, is available externally. The function can be utilized when EUT malfunctions. The Unit does not have any function to judge EUT’s malfunction. EUT FAIL signal should be prepared in user’s side.
  • Page 80: Connection Of Indicator

    17. OTHER FUNCTIONS 17-2. Connection of indicator Warning Lamp/ Tri-color pilot light is optionally available. When using an either option, connect to 【INDICATOR】connector on rear panel when in use. Indicator connector Warning lamp ( ( ( ( using optional 11-00008A) ) ) ) The warning light rotates and lights on as test is conducted.
  • Page 81: Normal Mode Testing ( Using Optional

    17. OTHER FUNCTIONS Normal mode testing( ( ( ( using optional 15-00013A) ) ) ) Capable of conducting normal mode noise injection testing conforming to ANSI/IEEE C37.90.1 by using an optional normal mode coupling balun.The normal mode coupling balun is the adaptor converting the common mode output of the simulator (the ground side of PULSE OUT is connected to the pulse signal ground) into floating output (the HIGH and LOW sides working against each other where ground is irrelevant)
  • Page 82 17. OTHER FUNCTIONS 4. 4. 4. 4. Connect the EUT to the simulator. EUT LINE OUTPUT ports selected in step 3 should be used. 5. 5. 5. 5. Turn of the simulator POWER. 6. 6. 6. 6. Perform the required test settings following the instructions in earlier pages. When testing in this mode, the PULSE OUT port should be active.
  • Page 83: Returning To Initial Setting

    17. OTHER FUNCTIONS 17-3. Returning to Initial Setting To return the whole setting to the initial setting in shipment, turn ON POWER switch【POWER】with pressing MENU switch【MENU】 When a user uses this function, all contents set on standard, manual, and sequence test screen and on utility screen are deleted simultaneously.
  • Page 84: Error Message

    18. ERROR MESSAGE Errors indicated on the Unit are shown as below table. Err No. Indication Meaning Emergency stop button was pressed. EMERGENCY STOP The Unit cannot be operated. ERROR1 CHECK SAFETY After confirming safety, turn on again. (For details, refer to P. 34) Repair is necessary.
  • Page 85: Specifications

    19. SPECIFICATIONS 19-1. Specifications of Generator Item Specifications Output voltage 120V~5000 V 10 V step Polarity Positive and negative Pulse Frequency 0.1 kHz~2000 kHz ~ 1 kHz 0.1 kHz /0.01 kHz Step ~ 10 kHz 1.0 kHz /0.01 kHz Step ~...
  • Page 86: Specifications Of

    19. SPECIFICATIONS 19-2. Specifications of CDN Item Specifications EUT Power capacity A20: Single-phase AC240 V/20 A, DC125 V/20 A(PE: 10 A) B63: 3-phase AC600 V/63 A, DC125 V/63 A(N/PE: 10 A) Coupling phase A20: L/N/PE B63: L1/L2/L3/N/PE Each line, All lines, Combinations of lines Coupling mode Common mode Line Input/Output...
  • Page 87: Other Specifications ———————————————————————————————————————

    19. SPECIFICATIONS 19-3. Other Specifications Item Specifications Emergency stop Push-lock type switch (Stops testing, Turns EUT line OFF) EUT FAIL function Detects an external FAIL signal (Hi→Lo). :+5 V,V :0 V FAIL signal Operation after detection: Pause or Stop FAIL input: 3 channels Accessories AC cable SG cable...
  • Page 88: Optional Products

    20. OPTIONAL PRODUCTS Major optional products are as follows. For details, enquire Noise Laboratory or your nearest sales agent of Noise Laboratory. Items MODEL No. Remarks Capacitive coupling clamp conforming to IEC61000-4-4. Coupling clamp 15-00012A Dedicated coupling clamp calibration fixture (15-00010A) also available Attenuator to observe output waveform.
  • Page 89: Waveform Verification

    21. WAVEFORM VERIFICATION Preparation Oscilloscope (Frequency range: DC~500 MHz or more) Attenuator 00-00017A: Optional product (Input impedance: 50 Ω, Output Impedance: 50 Ω, Attenuation: 40 dB) Attenuator 00-00018A: Optional product (Input impedance: 1 kΩ, Output Impedance: 50 Ω, Attenuation: 60 dB) CDN waveform verification connector 21-1.
  • Page 90 21. WAVEFORM VERIFICATION For observing waveform on an oscilloscope with connecting load resistance, the actual output voltage and the input restriction of the oscilloscope should be checked previously. The output voltage of the pulse to be observed can be found with applying the following 〔Formula 1〕.
  • Page 91: Verification At Eut Line Out(Waveform Verification With 50 Load

    21. WAVEFORM VERIFICATION 21-2. Verification at EUT LINE OUT( ( ( ( Waveform Verification with 50Ω Ω Ω Ω Load) ) ) ) ① Mount the waveform verification connector onto each individual EUT LINE OUTPUT port in turn and ground reference socket by inserting the waveform verification plug straight onto EUT LINE OUTPUT socket and its ground reference socket next to the connector.
  • Page 92: Waveform For Reference ——————————————————————————————————————

    21. WAVEFORM VERIFICATION ② Connect the CDN waveform verification connector to the input connector of 00-00017A with a coaxial cable (connector: NMHVP-NMHVP) which is attached to 00-00017A as the accessory. Connect the output side of 00-00018A to an oscilloscope with the attached coaxial cable. Insert an attenuator between them if necessary.
  • Page 93: Warranty

    22. WARRANTY Servicing terms The following terms are applicable to servicing by Noise Laboratory Co., Ltd., (hereafter referred to as the Company) provided to maintain the intended performance of its products. 1. Scope The following terms shall apply only to products made by the Company. 2.
  • Page 94 22. WARRANTY Limited warranty Noise Laboratory Co., Ltd. (hereafter referred to as the Company) warrants its products to be free from defects in materials and workmanship under normal use and service for a period of one year from date of delivery. In the event of failure of a product covered by this warranty, the Company will repair the product or may, at its option, replace it in lieu of repair without charge.
  • Page 95: Maintenance

    23. MAINTENANCE When repair, maintenance or internal adjustment of the unit is required, a qualified service engineer takes charge of such work. Maintenance on the user side is restricted to the outside cleaning and functional check of the unit. When checking or replacing the fuse, turn off the switch of the unit and disconnect the plug socket beforehand.
  • Page 96: Noise Laboratory Support Network

    NOISE LABORATORY CO., LTD. SALES DEPT. TEL: +81-42-712-2051 FAX +81-42-712-2050 E-mail: sales@noiseken.com http://www.noiseken.com...
  • Page 97: Information For Ce Marking, Eu And European Territories

    Information for CE Marking, EU and European territories Manufacture: Noise Laboratory Co., Ltd 1-4-4, Chiyoda, Chuo-ku, Sagamihara City, Kanagawa Pref., 252-0237, Japan Importers: Territory: Germany, Austria, Benelux and Eastern Europe DHS Elmea Tools GmbH Main Office Carl-Zeiss-Strasse 43 63322 Roedermark, Germany DHS Elmea Tools GmbH Office Tulln/Austria Bruedergass 1-3, Top B14 3430 Tulln, Austria...
  • Page 98 NOISE LABORATORY CO., LTD. 1-4-4, Chiyoda, Chuo-ku, Sagamihara City, Kanagawa Pref., 252-0237, Japan TEL: +81-42-712-2051 FAX: +81-42-712-2050 URL: http://www.noiseken.co.jp Printed in Japan...

Table of Contents