4. Installation

4.1 Delivery check

Check that all has been delivered and that the goods have not been
damaged during transport. If that is not the case, please notify the delivery
company. Transport damages should be reported to the forwarding agency.

4.2 Preparations for installation

Check that the measurements and capacity range of the burner are
compatible with the boiler. The power ratings on the type plate refer to the
min. and max. power of the burner.

4.3 Gas supply

For good operating safety, it is important that the gas supply system is
installed correctly.
Consider the following:
1.
Check that the burner is approved for the gas quality of the installation.
If not, please contact the supplier.
2.
Check that the gas components of the burner are approved for
indicated gas pressure.
3.
The gas supply system should be installed in accordance with current
standards.
4.
Pipe lines should be run so that service on boiler and burner is
facilitated.
5.
Pipe lines should be run so that eventual contaminants cannot come
into contact with the gas components.

4.4 Electrical connection

• Before work on the electrical connection, the current should be
disconnected so that the installation is isolated.
• Electrical connection must be done in accordance with the applicable
regulations.
• Burners should be connected to an isolator switch.
• The connection should be made in accordance with the wiring
diagram.
• Fuse rating is as required
!
If an electric connection other than the one recommended by Enertech is used, a
risk of damage and injury can arise.
172 515 85
2018-08-10
13