Framing With Non-Combustibles - Napoleon Vector TLV50N Installation Manual

Table of Contents

Advertisement

Available languages

Available languages

10.0 fi nish framing - after appliance installation

10.1 framing with non-combustibles

fl ush
Ceiling
minimum framing
Ref
TLV50
K
E
F
65 13/16" (167.2cm)
J
Optional - Appliance does not need to be elevated above fl oor
L
73" (185.4cm)
note:
The TLV series requires a minimum enclosure/ceiling height, as illustrated (dimension L), measured from the bottom
of the appliance. For temperature requirements, this area must be left unobstructed. Some venting confi gurations
that require more vertical rise will require a larger enclosure to provide minimum vertical clearance between vent
pipes and combustibles.
fi nish framing - after appliance installation
L
J
TLV62
31 15/16" (81.1cm)
48 3/16" (122.4cm)
20 1/8" (51.1cm)
77 13/16" (197.6cm)
89 13/16" (228.1cm)
91" (231.1cm)
note:
Shaded components (fi nish framing) must be
non-combustible materials.
Finish framing must be built after the appliance has
been placed in its fi nal position and venting
connected.
K
E
F
TLV74
Drywall
Insulation
W415-4121 / B / 04.20.23
EN
43

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vector seriesVector tlv50pVector tlv62nVector tlv62pVector tlv74nVector tlv74p ... Show all

Table of Contents