Control Connections - GE Entelli-Switch 250 Operation And Maintenance Manual

Microprocessor controller transfer switch control panel
Table of Contents

Advertisement

Installation
Turn OFF all power before installation, adjustment, or removal of transfer switch or any of its components.

Control Connections

Figure 5
Engine Start
Connections
Input/Output
Connectors
to I/O Modules
A complete information package is furnished with
each transfer switch including a complete connection
diagram and schematic which details all necessary
control circuit field connections.
The engine start control wires connect to the
engine start relay terminals located to the left
of the microprocessor. Figure 5 shows the location
of these terminals.
6
Entelli-Switch 250 Operation and Maintenance Manual (71
(cont'd)
DANGER
HAZARDOUS VOLTAGE
(Can Cause Severe Injury or Death)
To Power
Panel
Get other manuals https://www.bkmanuals.com
To R/T Box
The terminals are clearly identified by a label on the
microcontroller backplate. In the case of manual trans-
fer switches, or in other applications not requiring the
microprocessor, clearly marked terminal blocks are
provided in the upper left corner of the control panel
for the engine start control wires.
-2000)
R
Clock Program
Backup Battery
Remove protective
strip to enable clock
functions
Network Connector
GE Zenith Controls

Advertisement

Table of Contents
loading

Table of Contents