AEC TDH-6 Series Operation And Installation Manual page 48

Large hot oil temperature control units
Table of Contents

Advertisement

Servicing the Unit Monthly or Every 500 Hours
Servicing the Unit Every Three Months
Page 48
• Lubricate the pump at the grease fittings with a high-
quality polyurea grease rated at 320ºF or higher.
Recommended: Chevron Black Pearl; do not over-lubricate.
• Adjust the pump drive belt tension. Use the belt tensioning
specifications listed in this chapter on Page 51. Make sure
that the motor pulley is properly aligned with the pump
pulley; use a straightedge to check. Tighten motor mounting
bolts after realignment.
• Inspect the screen in the Y strainer for accumulations of
debris. Clean as needed.
Remove and clean the screen in the Y-strainer. Replace the screen
if it is damaged.
TDH-6 Series Hot Oil Large Temperature Control Units

Advertisement

Table of Contents
loading

Table of Contents