Installation - Tripp Lite SmartRack SRWO2UBRKT Assembly Instructions Manual

Vented wall-mount cabinet
Table of Contents

Advertisement

Available languages

Available languages

Installation

1. Installation is to be performed only by qualified service personnel.
2. Install the cabinet securely to the building wall using the proper hardware.
3. The wall surface, the wall studs and all user-supplied mounting hardware must be able to support the combined weight of
the cabinet and any equipment that will be installed in the rack. The cabinet can support equipment up to its maximum
load capacity of 75 lb. when mounted vertically as shown in diagrams.
4. Wall-mounting holes are spaced 16 inches apart horizontally to accommodate standard placement of wall studs. It is
advised to safety distribute the weight of the cabinet and all installed equipment.
5. Cabinet ground stud shall be connected to reliable earth ground with nut and star washer (user supplied).
Note: SRWO2UBRKT shown. Assembly is the same
1
for the SRWO4UBRKT.
x16 (SRWO2UBRKT)
x32 (SRWO4UBRKT)
x16 (SRWO2UBRKT)
x32 (SRWO4UBRKT)
Tripp Lite has a policy of continuous improvement. Specifications are subject to change without notice.
x16 (SRWO2UBRKT)
x32 (SRWO4UBRKT)
x16 (SRWO2UBRKT)
x32 (SRWO4UBRKT)
Photos and illustrations may differ slightly from actual products.
1111 W. 35th Street, Chicago, IL 60609 USA • tripplite.com/support
Install the enclosure securely to the building wall
2
using proper hardware (not included).
.43 in.
[10.8 mm]
[406.4 mm]
.43 in.
[10.8 mm]
4
16 in.
[406.4 mm]
16 in.
.27 in.
[6.8 mm]
[406.4 mm]
.27 in.
[6.8 mm]
16 in.
[406.4 mm]
16 in.
21-03-381 93-3E67_revA

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smartrack srwo4ubrktAg-060e

Table of Contents