Efco SwapLoader SL-400 Parts And Operation Manual page 35

Table of Contents

Advertisement

7.
Fill out pre-delivery checklist and warranty card and mail to SwapLoader U.S.A., Ltd.
NOTE:
CAUTION: The SwapLoader hoist must be used with bodies or containers that
When the SL-400 hoist is equipped with a standard 61-3/4" fixed jib see subframe Drawing
No. S288, otherwise when equipped with the optional 61-3/4" to 53-7/8" adjustable dual
height jib see subframe Drawing No.'s S288 or S905.
SL-400.INS
09/2009
Failure to fill out and return warranty card within 15 days of
installation may possibly void the warranty.
properly fit the front hook and the rear hold-downs (See figure S288).
If possible, pick up one of the containers that will actually be used
with the SwapLoader hoist and verify the following:
-
Outside dimensions of the long sills match the guiding rollers
on the hoist.
-
The front hook dimensions are correct for the hoist.
-
The rear hold-downs of the container latch into the hold-downs
on the hoist.
-
Check for any interference between the container and any part
of the hoist (i.e.: Hydraulic tank, hydraulic tubing or hose,
hydraulic valve, etc.)
2-20

Advertisement

Table of Contents
loading

Table of Contents