Efco SwapLoader SL-400 Parts And Operation Manual page 25

Table of Contents

Advertisement

INSTALLATION PROCEDURE FOR A HYDRAULIC CONTROL
CABLE TO HYDRAULIC VALVE WITH BONNET CONNECTION KIT
1. Turn .750-16 UNF Jam Nut entire length of Threaded Hub back over the Cable. Place
Flange onto Sleeve.
2. Turn Flange/Sleeve Assembly entire length of Threaded Hub back over the Cable.
3. Turn .250-28 UNF Jam Nut onto Threaded Rod until it bottoms.
4. Turn Terminal Eye onto Treaded Rod until it bottoms against Jam Nut. (Minor adjustments
may be necessary to align Terminal Eye with spool yoke.)
5. Slide the Terminal Eye into yoke on spool and align the holes. Insert Clevis Pin through
yoke and Terminal Eye holes. Install Retaining Ring into groove between Terminal Eye and
one side of the Yoke.
6. Now, with the Cable attached to the valve and control head, turn the Flange/Sleeve Assemble
back onto the Threaded Hub until it is flush with the valve face. When turning on the
Flange/Sleeve Assembly, make sure that the control head remains in neutral.
7. Thread the .750-16 UNF Jam Nut back over Threaded Hub and tighten against the Sleeve to
lock in position.
8. Bring Flange into position on bolt assembly to valve housing.
NOTE: FOR WORK SECTION NEXT TO INLET COVER, USE SPACER KIT.
RETURN NUT
SCREW NUT BACK
SL-400.INS
09/2009
ALIGN
HOLES AND
INSERT PIN
SCREW
FLANGE SLEEVE BACK
SCREW FLANGE
SLEEVE FLUSH WITH
FACE OF VALVE
SCREW NUT ON
ROD
SCREW
TERMINAL
EYE
BOLT FLANGE
TO VALVE BODY
FACE OF VALVE
VALVE
BODY
2-10

Advertisement

Table of Contents
loading

Table of Contents