Curtis Primo Cappuccino PCGT3700 User Manual page 37

3 station dispensing system
Table of Contents

Advertisement

TROUBLESHOOTING GUIDE
Dump Valve Calibration
After installing a new dump valve, do not reinstall the dump valve cover and canisters, so that you can perform the
calibration steps below:
1
Turn the toggle switch on the back of the unit to the ON position. Wait for the ready light to come on.
2
Place a measuring cup below the spout connected to the dump valve that was replaced.
3
rate is too high or too low, perform the steps that follow.
4
5
correct.
TG24
Programming Guide section.

Advertisement

Table of Contents
loading

Table of Contents