Section 6
Factory Options
Injection Assembly, Vent
Stack and Solenoid (cont.)
Figure 6-1. Injection Assembly
6-2
Model 8600 Series
6. Install the vent stack through the opening and secure it to the top of
the freezer, using screws.
7. Go to the interior and seal around the end of the vent stack with
Permagum.
8. Install the transfer hose connecting one end to the injection assembly,
the other end to the solenoid valve. Install the solenoid valve to the
supply source. The solenoid mounting bracket is not required and may
be discarded.
Caution When selecting a CO
siphon tube.
▲
supply cylinder, it must be equipped with a
2
Figure 6-2. Vent Stack
Thermo Fisher Scientific