Follett C33985 Operation And Service Manual page 20

Ice machines
Table of Contents

Advertisement

3. Press new mating ring into main housing as shown.
4. Lube the shaft with liquid soap in the area shown and
slip on seal and spring.
Note:
Do not touch the sealing surfaces. Use cardboard disk to
install.
5. Reinstall main housing as shown.
6. Orient auger shaft with keyway in the upward position.
7.
Force main housing into position against evaporator and
place 1/4" (7 mm) diameter Phillips screwdriver into hole
in the auger shaft.
8. Replace V-band clamp as shown.
9. Replace nut on V-band clamp and tighten.
10. Remove screwdriver.
20
Fig. 19
Lube with
soap
Do not touch
Fig. 20
Fig. 21
Note: Shuttle housing
removed for clarity
Horizon 1400R/N Ice Machines
Cardboard
disc

Advertisement

Table of Contents
loading

Table of Contents