Sinclair ASH-13AIA1 PT User Manual page 15

Hide thumbs Also See for ASH-13AIA1 PT:
Table of Contents

Advertisement

Installation of outdoor unit
2. Fix the power connection wire and signal control wire with wire clip (only for
cooling and heating unit).
Note:
● After tighten the screw, pull the power cord slightly to check if it is firm.
● Never cut the power connection wire to prolong or shorten the distance.
Step six: neaten the pipes
1. The pipes should be placed along the wall,
bent reasonably and hidden possibly. Min.
semidiameter of bending the pipe is 10cm.
2. If the outdoor unit is higher than the wall
hole, you must set a U-shaped curve in the
pipe before pipe goes into the room, in
order to prevent rain from getting into the
room.
Note:
● The through-wal height of drain hose
shouldn't be higher than the outlet
pipe hole of indoor unit.
● The water outlet can't be placed
in water in order to drain smoothly.
The water outlet
can't be placed
in water
● Slant the drain hose slightly dow-
the drain hose
can't raise
upwards.
12
U-shaped curve
nwards. The drain hose can't be
curved, raised and fluctuant, etc.
The drain hose can't be fluctuant
The drain hose
can't be fluctuant
wall
drain hose
The water
outlet can't be
fluctuant

Advertisement

Table of Contents
loading

This manual is also suitable for:

Arctic seriesAsh-18aia1 pt

Table of Contents