Hunter 44378 Owner's Manual page 18

Table of Contents

Advertisement

10. The day select screen will now show "Copy Day" and ask you if you wish to copy the day
you just scheduled to any other days. Select "YES" and
"NO".
11. Select each day you wish to copy the schedule to by using the
on or off and the
day will indicate it has been selected.
Note: The original day you schedule will not show on the screen as it is the one being copied.
12. Select
Done/
Home
"COPIED". You will be taken back to the day select screen to schedule your remaining days.
Repeat steps 3-12 to finish scheduling.
Note: If you select "NO" and then
bypassing the "Copy" function. Repeat steps 3-11 for each day you wish to schedule
separately.
13. When all days have been scheduled, whether using the copy function or not, the screen
will flash "Schedule Updated!" along with all the days, and return you to the home screen.
Note: To go back and edit schedules, you will follow the same process as outlined above.
18
Setting Your Schedule
or
buttons to scroll through the days. An arrow
Next
Back
and the screen will show the days that now have the same schedule and flash
you will be asked to select the next day to schedule,
Next
44126-01 • 07/30/2012
or see step 13 for selecting
Next
or
buttons to turn days
above each

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

44379

Table of Contents