Final Steps - Schumacher EV Series Manual

Mode 3 ev wall charger
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
EN - English
3. Lift the charging station and then use the notch on the back of the
unit to hang the unit from the screw affixed to the stud.
4. Align the charging station's lower mounting hole with the lower pilot
hole you drilled in step 1. Drive the 5.5 mm x 50 mm lag screw with
the rubber washer through the lower mounting hole and into the
pilot hole. Tighten until the charging station is secure.

FINAL STEPS

For model SEV455, the following steps must be completed by a
licensed electrician.
1.
Before starting, the licensed electrician should consult all applicable
codes for breaker and wire sizing requirements. Set the amperage of
the unit according to the connected dedicated breaker associated
with the hardwired connection. Then, set the unit's DIP switch
following the diagram below that corresponds with the dedicated
breaker's voltage and amperage and the model's requirements.
- 10 -

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sev455

Table of Contents