The
LAS 260.1 is designed to be transported in a vertical
position.
The following conditions must be met during transport and
storage:
Temperature:
Temporarily (max. 24 hrs):
Humidity:
Before starting with the installation:
Check the unit and the filter for any transport damage
that may be present.
Report any damage to the carrier.
Remove all transport packaging.
All transport packaging is recyclable; please consult
your local waste disposal company for information
about proper disposal.
The Extraction Unit should be set up in the place intended for
it. It should be on a level floor and standing upright, with
horizontal surfaces properly leveled. Apply the brakes of the
casters.
Minimum distances must be maintained to other machines or
parts of the building to ensure that safe maintenance access is
provided and to allow the clean gas to escape without any
obstructions.
These are:
-
On all sides: +0.5 m
Minimum distances for maintenance and service activities:
-
On all sides: +1.0 m
The LAS 260.1 is operated standing up. You can use the
intake nozzle depending on your usage requirements.
The intake nozzle of the Extraction and Filtration System
LAS 260.1 is designed for the connection of:
Hose systems 1 x DN80.
The hose system is to be mounted by the operator directly on
the pipe nozzle during the course of the commissioning
process.
Transport and storage
-25 °C to +55 °C
Up to +70 °C
10% - 80% relative humidity (non-
condensing)