Power Supply Requirements - Fujitsu MAT3300FC Product/Maintenance Manual

Table of Contents

Advertisement

Installation Requirements
4.2

Power Supply Requirements

(1)
Allowable input voltage and current
The power supply input voltage measured at the power supply connector pin of the IDD (receiving
end) must satisfy the requirement given in Subsection 2.1.3. (For other requirements, see Items (4)
below.)
(2)
Current waveform (reference)
Figure 4.7 shows the waveform of +12 VDC.
MAT3300FC
Time (2 sec/div)
(3)
Power on/off sequence
The order of the power on/off sequence of +5 VDC and +12 VDC, supplied to the IDD, does not
matter.
(4)
Sequential starting of spindle motors
After power is turned on to the IDD, a large amount of current flows in the +12 VDC line when the
spindle motor rotation starts. Therefore, if more than one IDD is used, the spindle motors should be
started sequentially using one of the following procedures to prevent overload of the power supply
unit.
a) Issue START/STOP commands at more than 12-second intervals to start the spindle motors. For
details of this command specification, refer to Fibre Channel Interface Specifications.
b) Turn on the +12 VDC power in the power supply unit at more than 12-second intervals to start
the spindle motors sequentially.
4-8
MAT3147FC
Time (2 sec/div)
Figure 4.7
Current waveform (+12 VDC)
MAT3073FC
Time (2 sec/div)
C141-E213

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mat3147fcMat3073fc

Table of Contents