6.4 Mounting the indoor unit
6.4.1 About mounting the indoor unit
6.4.2 Precautions when mounting the indoor unit
6.4.3 To install the indoor unit
EPRA14~18DAV3+W1 + ETVH/X16S18+23DA6V+9W(G)
Daikin Altherma 3 H HT F
4P587502-1A – 2020.01
Typical workflow
Mounting the indoor unit typically consists of the following stages:
1
Installing the indoor unit.
INFORMATION
Also read the precautions and requirements in the following chapters:
▪
"1 General safety
▪
"6.1 Preparing the installation
1 Lift the indoor unit from the pallet and place it on the floor. Also see
handle the indoor
2 Connect the drain hose to the drain. See
4
the
drain" [
72].
3 Slide the indoor unit into position.
4 Adjust the height of the leveling feet to compensate for floor irregularities.
The maximum allowed deviation is 1°.
5
6
precautions" [
4
6]
4
site" [
55]
4
unit" [
21].
6
Unit installation
|
"6.4.4 To connect the drain hose to
≤1°
Installer reference guide
"3.3.3 To
71