Ultra Heat GMV Multi VRF
Fixing point 2: 200mm (7-7/8in.) on the main branched manifold from the welding point.
Fixing point 3: 250mm(9-5/6in.) on the branched pipe from the welding point.
(4) Suspend the header to the ceiling, and be sure to install T-type manifold so that the outlet pipes
are horizontal at the lower side.
(5) Thermal insulation for pipeline
Fig.26
Fig.27 (a)
Fig.27 (b)
23