Mira Advance Standard J97I Installation And User Manual page 17

Hide thumbs Also See for Advance Standard J97I:
Table of Contents

Advertisement

Commissioning
On initial installation, the appliance needs to 'learn' about the site conditions and
does so during the commissioning cycle.
Once set, the shower constantly updates it's memory with information about the site
conditions to deliver the best performance.
DO NOT commission the appliance if water leaks from the unit.
Set Maximum Temperature and Commissioning Cycle
1. Shower is OFF.
Water has STOPPED flowing.
Power/Electric is OFF.
2. Set Maximum Temperature
Turn the dial to the desired position in the
table. This will set the maximum temperature
for showering.
When showering, the set maximum
temperature is reached when the dial is
turned to number '9'.
(See also section: "BEAB Care".)
Record the Maximum Temperature setting
on the BEAB Care In-Service Test Record
(separate form supplied) if applicable to the
installation.
3. Turn Power/Electric ON.
Within 30 seconds push and hold HIGH/LOW &
START/STOP buttons at the same time.
17
OFF
Max.
No.
Temp
°C
1
37
2
38
3
39
4
40
5
41
6
42
7
45
8
48
ON

Advertisement

Table of Contents
loading

This manual is also suitable for:

Advance flex j97k1.1759.003

Table of Contents