Table Of Contents - Daikin VRV IV+ RYYQ12U7Y1B Series Installer And User Manual

Hide thumbs Also See for VRV IV+ RYYQ12U7Y1B Series:
Table of Contents

Advertisement

Table of contents

Table of contents
1.1
About the documentation ..........................................................
1.1.1
Meaning of warnings and symbols..............................
1.2
For the user ...............................................................................
1.3
For the installer..........................................................................
1.3.1
General .......................................................................
1.3.2
Installation site ............................................................
1.3.3
Refrigerant ..................................................................
1.3.4
Brine............................................................................
1.3.5
Water ..........................................................................
1.3.6
Electrical .....................................................................
2.1
About this document..................................................................
3.1
Overview: About the box ...........................................................
3.2
To unpack the outdoor unit........................................................
3.3
3.4
Accessory pipes: Diameters......................................................
3.5
To remove the transportation stay.............................................
4.1
Overview: About the units and options......................................
4.2
Identification label: Outdoor unit................................................
4.3
About the outdoor unit ...............................................................
4.4
System layout............................................................................
4.5
Combining units and options .....................................................
4.5.1
About combining units and options .............................
4.5.2
Possible combinations of indoor units......................... 10
4.5.3
Possible combinations of outdoor units ...................... 10
4.5.4
Possible options for the outdoor unit........................... 10
5.1
Overview: Preparation............................................................... 11
5.2
Preparing the installation site .................................................... 11
5.2.1
5.2.2
outdoor unit in cold climates ....................................... 12
5.2.3
5.3
Preparing refrigerant piping....................................................... 13
5.3.1
Refrigerant piping requirements.................................. 13
5.3.2
To select the piping size ............................................. 13
5.3.3
To select refrigerant branch kits.................................. 15
5.3.4
About the piping length ............................................... 15
5.3.5
Piping length: VRV DX only ........................................ 16
5.3.6
Piping length: VRV DX and Hydrobox ........................ 17
5.3.7
Piping length: VRV DX and RA DX............................. 17
5.3.8
5.4
Preparing electrical wiring ......................................................... 19
5.4.1
About preparing electrical wiring................................. 19
5.4.2
About electrical compliance ........................................ 19
5.4.3
Safety device requirements ........................................ 19
6.1
Overview: Installation ................................................................ 20
6.2
Opening the units ...................................................................... 20
6.2.1
To open the outdoor unit............................................. 20
6.2.2
unit .............................................................................. 20
6.3
Mounting the outdoor unit.......................................................... 21
6.3.1
To provide the installation structure ............................ 21
6.4
Connecting the refrigerant piping .............................................. 21
2
6.4.1
6.4.2
About connecting the refrigerant piping ....................... 22
6.4.3
To route the refrigerant piping...................................... 22
6.4.4
6.4.5
3
6.4.6
Multiple outdoor units: Knockout holes ........................ 23
3
6.4.7
3
6.4.8
To protect against contamination................................. 23
4
6.4.9
To braze the pipe end .................................................. 23
4
6.4.10
Using the stop valve and service port .......................... 24
4
6.4.11
To remove the pinched pipes....................................... 24
5
6.5
Checking the refrigerant piping .................................................. 25
5
6.5.1
About checking the refrigerant piping .......................... 25
6
6.5.2
6
6.5.3
Checking refrigerant piping: Setup............................... 25
6
6.5.4
To perform a leak test .................................................. 26
7
6.5.5
To perform vacuum drying ........................................... 26
6.6
To insulate the refrigerant piping................................................ 26
7
6.7
Charging refrigerant ................................................................... 27
6.7.1
Precautions when charging refrigerant ........................ 27
6.7.2
About charging refrigerant ........................................... 27
7
6.7.3
6.7.4
To charge refrigerant: Flow chart................................. 29
7
6.7.5
To charge refrigerant ................................................... 30
7
6.7.6
7
6.7.7
8
6.7.8
Error codes when charging refrigerant......................... 33
8
6.7.9
Checks after charging refrigerant................................. 33
8
6.7.10
9
6.8
Connecting the electrical wiring.................................................. 33
6.8.1
9
9
6.8.2
Field wiring: Overview.................................................. 34
9
6.8.3
About the electrical wiring ............................................ 34
9
6.8.4
9
6.8.5
9
6.8.6
To connect the transmission wiring.............................. 35
6.8.7
To finish the transmission wiring.................................. 36
6.8.8
To route and fix the power supply................................ 36
6.8.9
To connect the power supply ....................................... 36
11
7.1
Overview: Configuration ............................................................. 37
7.2
Making field settings................................................................... 37
7.2.1
About making field settings .......................................... 37
7.2.2
Field setting components ............................................. 38
7.2.3
To access the field setting components....................... 38
7.2.4
To access mode 1 or 2 ................................................ 38
7.2.5
To use mode 1 ............................................................. 38
7.2.6
To use mode 2 ............................................................. 39
7.2.7
Mode 1: Monitoring settings......................................... 39
7.2.8
Mode 2: Field settings.................................................. 40
7.2.9
7.3
Energy saving and optimum operation....................................... 43
7.3.1
Available main operation methods............................... 43
7.3.2
Available comfort settings ............................................ 44
7.3.3
7.3.4
7.4
Using the leak detection function ............................................... 46
7.4.1
About automatic leak detection.................................... 46
7.4.2
To manually perform a leak detection.......................... 46
20
8.1
Overview: Commissioning.......................................................... 46
8.2
Precautions when commissioning .............................................. 47
8.3
Checklist before commissioning................................................. 47
8.4
About the test run ....................................................................... 47
8.5
To perform a test run.................................................................. 48
8.6
8.7
Operating the unit....................................................................... 49
37
46
4P546228-1 - 2018.09

Advertisement

Table of Contents
loading

Table of Contents