Restore To Normal Operation After Epo (Emergency Power Off) - GE 750 UL S2 User Manual

Table of Contents

Advertisement

7.2.8 Restore to normal operation after EPO (Emergency Power Off)

NOTE !
Make sure the all Units of the Parallel System to be status of the activation of EPO, i.
e. UPS Output Switches Q1 closed (Pos. I), External Maintenance Bypass Switches
(option) open (Pos. O) and Battery Circuit Breakers connected (Pos. I).
If eBoost™ option is available, make sure that eBoost™ Operation Mode is disabled
before starting the shutdown procedure.
View of the synoptic diagram, on all UPS units, after
activation of EPO (Emergency Power Off) with Utility
available.
All Contactors are open.
Rectifier, Inverter and Static-Switch shutdown.
LED Alarm is lit.
1. Reset the EPO (Emergency Power Off) button.
Press the "MUTE" key to reset alarm and acoustical alarm.
LED Alarm remains lit.
Press
2.
"Inverter OFF" ( O ) key on all Units.
Rectifiers start automatically, blinking LED 3 (Rectifier ON) indicates Soft-start.
At the end of Rectifier Soft-start, the LED 3 (Rectifier ON) remains lit.
After pressing the "Inverter OFF" key on the last unit of the Parallel System, the output of all Units connect to
Automatic Bypass.
The Synoptic Diagram, on all UPS units, must display the status "LOAD SUPPLIED BY AUTOMATIC BYPASS".
Synoptic Diagram of first unit
Modifications reserved
OPM_SGS_USM_M75_M75_2US_V010.doc
Synoptic Diagram of other units
User Manual SG Series 750 UL S2 & SG Series 750 T12 UL S2
Continue ►
Page 65/71

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sg series750 t12 ul s2

Table of Contents