Section 4: M8Ebq/M12Ebq Chiller And Fountain Connections - Oasis MWEBQ User Manual

Electronic bottle fillers
Table of Contents

Advertisement

SECTION 4: M8EBQ/M12EBQ CHILLER AND FOUNTAIN CONNECTIONS

A.
Install Chiller in Frame.
B.
Install 1/4" Union on Chiller inlet.
C.
Connect 1/4" Union Tee to Chiller Outlet.
D.
Determine tube length needed to
connect bottle filler solenoid "in" to chiller
tee. (Use line with attached ball valve)
Cut 1/4" O.D. tube and connect to branch
of tee. Squeeze tube end back to round
shape as needed before connecting.
E.
Attach remaining tubing from ball valve
to chiller inlet.
1/4" Union
Fitting
1/4" Union
Fitting
1/4" Tee
Fitting
F.
Remove reducer fitting and copper tube
from fountain water line. Install provided
1/4" union.
G.
Determine length of tube needed to
connect bottle filler solenoid "out" to
bottle filler delivery fitting. Cut off excess.
Squeeze tube end back to round shape
as needed.
H.
Use excess tube to connect fountain to
chiller tee.
IMPORTANT: Refer to Electrical
I.
Connections on page 12, step 4 for
proper grounding instructions.
Solenoid Valve
Out
Provided Ball
Valve and 3/8"
O.D. Copper to
building water
supply
16
Solenoid Valve
In

Advertisement

Table of Contents
loading

Table of Contents