Section 3: Mw8Ebq, Mw12Ebq - Oasis MWEBQ User Manual

Electronic bottle fillers
Table of Contents

Advertisement

SECTION 3: MW8EBQ, MW12EBQ

STEP 1 : FILTER INSTALLATION (WITH CHILLER)
A.
Attach cradle to frame per rough-in drawing. (Screws Provided - 4)
B.
Place chiller in frame.
C.
Install 1/4" union fittings on chiller inlet and outlet.
D.
Connect water line from bottle filler solenoid valve out to chiller water in. Connect chiller
water out to bottle filler delivery fitting. Note: squeeze ends of tubes back to round shape
as needed after cutting.
E.
IMPORTANT: Refer to Electrical Connections on page 12, step 4 for proper grounding
instructions.
Solenoid Valve
Out
Solenoid Valve
In
Not Included
Chiller Water in
Chiller Water Out
Insulated Tube
Connections to Filler
Fitting
13
Provided Ball Valve
and 3/8" O.D. copper
to building water
supply
Strainer Inside

Advertisement

Table of Contents
loading

Table of Contents