Section 2: Installation - Oasis MWEBQ User Manual

Electronic bottle fillers
Table of Contents

Advertisement

SECTION 2: INSTALLATION

STEP 1: INSTALL MOUNTING FRAME
A.
Install Frame per rough-in
drawing. Note: If applicable,
refer to trim bezel installation
instructions on page 11 before
continuing with step 1B.
B.
Place drip tray in frame but do
NOT fasten in place. Do NOT
place grille on tray until last step
(Section 6).
C.
Install snap bushings.
STEP 2: MWEBQ (WITHOUT CHILLER ONLY)
A.
Install provided ball valve and 3/8"
O.D. copper tube to building water
supply.
B.
Install tubing as shown before
mounting the panel assembly.
C.
Uncoil EBQ push button wire lead
and route through same opening in
frame as the tubing.
D.
Install upper panel assembly
(screws provided)
E.
Install lower louver panel using
supplied locks or screws.
F.
Install drip tray grille using 3
flathead screws, provided.
IMPORTANT: Refer to Electrical
G.
Connections on page 12, step 4 for
proper grounding instructions.
Drip Tray
2x4
Junction
Box
Solenoid
Valve Out
Solenoid
Valve In
Provided Ball
Valve and 3/8"
O.D. Copper to
building water
supply
10
Snap
Bushings
Short Radius
P-Trap
(Not Included)
Optional Filter
Location Less
Chiller

Advertisement

Table of Contents
loading

Table of Contents