Sussman MBA Installation, Operation And Maintenance Manual

Electric steam generator

Advertisement

Installation, Operation and Maintenance Manual
Model No. ___________________________
Generator Serial No. __________________
National Board No____________________
IMPORTANT: This data file contains the National Board Registration Certificate
approving your generator. It must be kept near the generator at all times.
Products Covered by this Manual
KW
Model
Range
__________________________________________________________________________________________
MBA3
3
__________________________________________________________________________________________
MBA6
6
__________________________________________________________________________________________
MBA9
9
__________________________________________________________________________________________
MBA12
12
__________________________________________________________________________________________
MBA18
18
__________________________________________________________________________________________
MBA20
20
__________________________________________________________________________________________
*Line water pressure must be a minimum of 10 PSIG higher than generator operating pressure or you will require high pressure water feed
w/motor and pump.
Power Circuit Voltage ___________________
Control Circuit Voltage __________________
Amps ________ Phase ________ Cy ________
Steam Rate
9 lbs./hr
18 lbs./hr
27 lbs./hr
36 lbs./hr
54 lbs./hr
60 lbs./hr
A Division of Sussman-Automatic Corporation
43-20 34th Street, Long Island City, NY 11101
Fax: (718) 937-4676
www.sussmanboilers.com
Steam Generator
Design
BHP
Pressure
0.3
100 PSIG
0.6
100 PSIG
0.9
100 PSIG
1.2
100 PSIG
1.8
100 PSIG
2.0
100 PSIG
(718) 937-4500
Email: seb@sussmancorp.com
MBA Electric
Max. Work
Pressure*
85 PSIG
85 PSIG
85 PSIG
85 PSIG
85 PSIG
85 PSIG
PN 101141 Rev 2/06
1-800 238- 3535

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MBA and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Sussman MBA

  • Page 1 *Line water pressure must be a minimum of 10 PSIG higher than generator operating pressure or you will require high pressure water feed w/motor and pump. PN 101141 Rev 2/06 A Division of Sussman-Automatic Corporation 43-20 34th Street, Long Island City, NY 11101 (718) 937-4500 1-800 238- 3535 •...
  • Page 2: Standard Features

    56, 49, 25 • Incoming water line pressure must be 10 PSIG greater than generator operating pressure. If not, a motor/pump must be used. Specify Sussman MBA38002A high pressure water feed motor/pump system. • When ordering specify Model No., KW, Volts/PH and motor/pump if required.
  • Page 3: Installation

    MBA Electric Steam Generator Installation, Operation and Maintenance Manual _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Installation Refer to National and all applicable Local Codes for specific installation requirements.
  • Page 4 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ MBA Steam Wiring Control Circuit Wiring Diagram Replacement Heating Elements Part No.
  • Page 5: Operation

    PRESSURE CONTROLS OPERATION AND TESTING NOTE: ALL MBA STEAM BOILERS ARE PROVIDED WITH ONE HI-LIMIT PRESSURE CONTROL AND ONE OPERATING PRESSURE CONTROL. All pressure controls are equipped with a screw allowing for setting of the desired operational and hi-limit pressures.
  • Page 6 HAZARD OF ELECTRICAL SHOCK. DISCONNECT ALL POWER BEFORE WORKING ON BOILER. Sussman Electric Steam boilers are designed for years of trouble-free performance. To establish a good preventative maintenance program, we suggest that the building maintenance person or engineer familiarize themselves with these simple rules.
  • Page 7: Gauge Glass Installation

    MBA Electric Steam Generator Installation, Operation and Maintenance Manual _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _...
  • Page 8 MBA Electric Steam Generator Installation, Operation and Maintenance Manual _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _...
  • Page 9: Element Replacement

    MBA Electric Steam Generator Installation, Operation and Maintenance Manual _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _...
  • Page 10: Water Quality Information For Carbon Steel Boilers

    MBA Electric Steam Generator Installation, Operation and Maintenance Manual _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _...
  • Page 11: Limited Warranty

    Limited Warranty THIS WARRANTY SUPERCEDES ALL PRIOR WARRANTY COVERAGE. Sussman-Automatic Corporation hereby extends to the original purchaser of its Industrial Steam and Hot Water Boilers, Steam Superheaters and Heat Exchanger products (“Boiler Products”) a warranty against defects in materials and workman- ship for the period indicated below.
  • Page 12 Stainless Steel Element Gauge Glass & Valves Full Insulation National Board Data Complete with Feed Water Strainer / Solenoid / Check Valve Representative of all MBA models MBA Spare Parts List 90229 Probe Plug 99128R Pressure Control Operating Pressuretrol 0-100 PSIG...

This manual is also suitable for:

Mba3Mba6Mba9Mba12Mba18Mba20

Table of Contents