Download Print this page

Gravely Pro-Turn 152 EFI Operator's Manual page 42

Hide thumbs Also See for Pro-Turn 152 EFI:

Advertisement

See Figure 57.
6. Position mower blades so ends point
front to back and measure the following:
• At the front of the deck, measure the
distance between the ground and the
cutting edge of the middle blade.
• At the rear of the deck, measure the
distance between the ground and the
cutting edge of the left and the right
blades.
Figure 57
If the front measurement is not 3.2 mm (1/8")
lower than the rear measurements, adjust the
blade pitch. See Adjust Blade Pitch on
page 40.
Level Mower Deck
See Figure 58.
1. Lower the high side of deck:
a. Loosen jam nuts against deck-
leveling links.
b. Turn adjustment bolts
counterclockwise.
c. Measure distance between the
ground and cutting edges of left and
right blades. Continue adjustment if
necessary.
d. Tighten jam nuts against deck-
leveling links.
2. Raise the low side of deck:
a. Loosen jam nuts against deck-
leveling links.
b. Turn adjustment bolts clockwise.
c. Measure distance between the
ground and cutting edges of left and
right blades. Continue adjustment if
necessary.
d. Tighten jam nuts against deck-
leveling links.
Lower
2
1. Adjustment Bolt
2. Jam Nut
3. Deck-Lift Link
Adjust Blade Pitch
IMPORTANT: Side-to-side deck heights
MUST remain level even after completing
pitch adjustment.
IMPORTANT: Pitching the front of the blades
lower than the rear provides a balance
between cut quality and the power needed to
cut grass. Certain cutting conditions require
the deck rear to be pitched lower than the
front. Positioning the deck this way requires
more engine power but can provide better cut
quality.
1. Increase forward pitch:
a. Loosen jam nuts against all deck-
leveling links.
b. Turn front adjustment bolts
counterclockwise to lower deck front.
c. Turn rear adjustment bolts clockwise
to raise deck rear.
d. Check adjustment. See Check Blade
Level and Pitch on page 39.
e. Tighten jam nuts against deck-
leveling links.
2. Decrease forward pitch:
a. Loosen jam nuts against all deck-
leveling links.
b. Turn front adjustment bolts clockwise
to raise deck front.
c. Turn rear adjustment bolts
counterclockwise to lower deck rear.
EN - 40
Raise
1
3
Figure 58

Advertisement

loading