Installation; Step 1 - Check Equipment; Step 2 - Mount Unit - Carrier 40MBAA Installation Instructions Manual

Air handler unit ductless system
Table of Contents

Advertisement

INSTALLATION

Step 1 - Check Equipment

Unpack the unit and move to the final location. Remove the carton,
taking care not to damage the unit. Inspect the equipment for damage
prior to installation. File a claim with the shipping company if the
shipment is damaged or incomplete. Locate the unit rating plate,
which contains the proper installation information. Check the rating
plate to be sure the unit matches the job specifications.
The indoor unit should be installed in a location that meets the
following requirements:
• Enough room for installation and maintenance
• Enough room for the lineset and drainpipe
• A horizontal ceiling and a structure that can sustain the weight of
the indoor unit
• The air inlet and outlet are not impeded
• There is no direct radiation from heaters
CAUTION
DO NOT install the unit in the following locations:
• Areas with oil drilling or fracking
• Coastal areas with high salt content in the air
• Areas with caustic gases in the air, such as near hot springs
• Areas with power fluctuations, such as factories
• Enclosed spaces, such as cabinets
• Areas with strong electromagnetic waves
• Areas that store flammable materials or gas
• Rooms with high humidity, such as bathrooms or laundry
rooms.
IM-40MBAA-02

Step 2 - Mount Unit

The unit can stand or lie on the floor, or hang from a ceiling or a wall.
Allow space for wiring, piping, and servicing the unit.
IMPORTANT: When the unit is installed over a finished ceiling and/
or living area, building codes may require a field-supplied secondary
condensate pan to be installed under the entire unit.
Some localities may allow as an alternative, the running of a separate,
secondary condensate line. Consult the local codes for additional
restrictions or precautions.
NOTE: Nuisance sweating may occur if the unit is installed in a
high humidity environment with low airflow.
C
B
Table 4 — Indoor Unit Dimensions
SIZES
24-48
(1,224mm)
Allow a minimum of 24in (60.9 cm) clearance from access panels.
Vertical Upflow Installations
Specifications subject to change without notice.
E
A
D
Fig. 5 — Indoor Unit Dimensions
A
B
C
48.2in
21in
19.6in
(533mm)
(498mm)
24in(60.9cm)
Horizontal Installations
Fig. 6 — Installation Clearances
E
D
D
E
18.2in
10.3in
(461mm)
(261mm)
5