Initial Setup; Verification - National Instruments NI-9225 Calibration Procedure

3-channel, 300 vrms, 24-bit, simultaneous, channel-to-channel isolated analog input module
Table of Contents

Advertisement

Initial Setup

Complete the following steps to set up the NI 9225.
1.
Install NI-DAQmx.
2.
Make sure the NI cDAQ-9178 power source is not connected.
3.
Connect the NI cDAQ-9178 to the system safety ground.
a.
Attach a ring lug to a 14 AWG (1.6 mm) wire.
b.
Connect the ring lug to the ground terminal on the side of the NI cDAQ-9178 using
the ground screw.
c.
Attach the other end of the wire to the system safety ground.
4.
Install the module in slot 8 of the NI cDAQ-9178 chassis. Leave slots 1 through 7 of the
NI cDAQ-9178 chassis empty.
5.
Connect the NI cDAQ-9178 chassis to your host computer.
6.
Connect the power source to the NI cDAQ-9178 chassis.
7.
Launch Measurement & Automation Explorer (MAX).
8.
Right-click the device name and select Self-Test to ensure that the module is working
properly.

Verification

The following performance verification procedures describe the sequence of operation and test
points required to verify the NI 9225 and assumes that adequate traceable uncertainties are
available for the calibration references.
4 | ni.com | NI 9225 Calibration Procedure