Section 10
Testing functionality by secondary injection
7.
Apply healthy normal load conditions to the IED for at least two seconds.
8.
Apply a fault condition within the permissive zone.
9.
Check that trip time complies with the zone timers and that correct trip outputs, external
signals, and indications are obtained for the actual type of fault generated.
10.11.1.3

Testing blocking scheme

1.
Deactivate the receive (CR) signal of the IED.
2.
Apply healthy normal load conditions to the IED for at least two seconds.
3.
Apply a fault condition within the forward directed zone used for scheme communication
tripping.
4.
Check that correct trip outputs and external signals are obtained for the type of fault
generated and that the operate time complies with the
measuring time).
5.
Check that the other zones operate according to their zone times and that a send (CS)
signal is only obtained for the reverse zone.
6.
Activate the IED receive (CR) signal.
7.
Apply a fault condition in the forward directed zone used for scheme communication
tripping.
8.
Check that the no trip from scheme communication occurs.
9.
Check that the trip time from the forward directed zone used for scheme communication
tripping complies with the zone timer and that correct trip outputs, external signals, and
indications are obtained for the actual type of fault generated.
10.11.1.4

Testing delta blocking scheme

1.
Deactivate the receive (CR) signal of the IED.
2.
Apply healthy normal load conditions to the IED for at least two seconds.
3.
Apply a fault condition within the forward directed zone used for scheme communication
tripping.
4.
Check that correct trip outputs and external signals are obtained for the type of fault
generated and that the operate time complies with the
measuring time).
5.
Check that the other zones operate according to their zone times and that a send (CS)
signal is only obtained for the reverse zone.
6.
Check that for a forward fault, carrier send (CS) signal is first obtained from the delta
based fault inception detection (as it is not directional) , and immediately inhibited by
the forward zone.
7.
Activate the IED receive (CR) signal.
8.
Apply a fault condition in the forward directed zone used for scheme communication
tripping.
9.
Check that the no trip from scheme communication occurs.
10.
Check that the trip time from the forward directed zone used for scheme communication
tripping complies with the zone timer and that correct trip outputs, external signals, and
indications are obtained for the actual type of fault generated.
10.11.1.5

Checking of unblocking logic

Check the unblocking function (if the function is required) when checking the communication
scheme.
Command function with continuous unblocking (
Procedure
184
tCoord timer (plus relay
GUID-D5FF46AF-0C5A-4AD4-8F2C-09EC17B681F1 v2
tCoord timer (plus relay
Unblock = 1 )
Commissioning manual
1MRK 505 345-UEN B
M13868-50 v5
M13868-72 v4
M13868-76 v6

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion red670

Table of Contents