Section 10
Testing functionality by secondary injection
Testing the voltage selection for 1 1/2 CB arrangements
At test of the SESRSYN function for a 1½ CB diameter the following alternative voltage inputs
can be used for the three SESRSYN (SESRSYN 1, SESRSYN 2, SESRSYN 3) functions. These three
SESRSYN functions can either be in one, two or three different IEDs. Table
scenario when SESRSYN 1, SESRSYN 2 and SESRSYN 3 all are in the same IED. If SESRSYN 3 is in
another IED, WA1 will be considered as WA2 and LINE2 as LINE1. The voltage is selected by
activation of different inputs in the voltage selection logic as shown in table
Table 33:
SESRSYN
SESRSYN 1
(Operates on
WA1_QA1)
SESRSYN 2
(Operates on
TIE_QA1)
SESRSYN 3
(Operates on
WA2_QA1)
176
Voltage selection logic
CBConfig
Section to
setting
be
synchroniz
ed
1 ½ bus CB
WA1 –
LINE1
WA1 –
LINE2
WA1 –
WA2
Tie CB
LINE1 –
LINE2
WA1 –
LINE2
WA2 –
LINE1
WA1 –
WA2
1 ½ bus
WA2 –
alt. CB
LINE2
(mirrored)
WA2 –
LINE1
WA2 –
WA1
Activated
Activated
Activated
B1QCLD
B2QCLD
LN1QCLD
input on
input on
input on
IED from
IED from
IED from
TIE_QA1
TIE_QA1
WA2_QA1
WA1_QA1
WA2_QA1
WA1_QA1
WA2_QA1
TIE_QA1
TIE_QA1
WA1_QA1
1MRK 505 345-UEN B
GUID-12E7DA63-FE04-4C83-9BA6-34818C510DB8 v4
33
describes the
33
and figure 43.
Activated
Indication
LN2QCLD
from
input on
SESRSYN
IED from
on IED
LINE1_QB
B1SEL,
9
LN1SEL
LINE2_QB
B1SEL,
9
LN2SEL
B1SEL,
B2SEL
LINE1_QB
LINE2_QB
LN1SEL,
9
9
LN2SEL
LINE2_QB
B1SEL,
9
LN2SEL
LINE1_QB
B2SEL,
9
LN1SEL
B1SEL,
B2SEL
LINE2_QB
B2SEL,
9
LN2SEL
LINE1_QB
B2SEL,
9
LN1SEL
B1SEL,
B2SEL