Dimensions - Lennox LGT092H Installation Instructions Manual

Hide thumbs Also See for LGT092H:
Table of Contents

Advertisement

CAUTION
As with any mechanical equipment, contact with
sharp sheet metal edges can result in personal in­
jury. Take care while handling this equipment and
wear gloves and protective clothing.
LGT/LCT092, 102, 120, & 150 DIMENSIONS -
58-1/8
(1476)
60-1/8
(1527)
END VIEW
60-1/8 (1527)
BASE
BOTTOM
POWER ENTRY
5-1/2 (140) Dia.
46-7/8
(1191)
43-3/8
(1102)
ELECTRIC
INLETS
3-1/2
(89)
GAS HEAT SECTION SHOWN
6-1/8
(156)
AA
6-1/8
24
10-3/4
(156)
(610)
(273)
27
(686)
BOTTOM RETURN
AIR OPENING
EE
6-5/8
7 (178)
(168)
DD
BOTTOM
7 (178)
CONDENSATE
34-7/8
(886)
OPTIONAL DISCONNECT
(FACTORY INSTALLED)
CONDENSATE
DRAIN (FRONT)
5-3/8
(137)
1
(25)
FORKLIFT SLOTS
34-7/8
(886)
39-7/8
(1013)
HORIZONTAL
SUPPLY AIR
OPENING
15-1/2
(394)
CONDENSATE
6-1/8
DRAIN (BACK)
(156)
31-1/2
(800)
66-3/8
(1686)
(Horizontal Openings)
Page 2
5-5/8
BOTTOM SUPPLY
(143)
AIR OPENING
28
(711)
20
(508)
CENTER OF
GRAVITY
FF
101-1/4
BASE
(2572)
TOP VIEW
99-1/4
(2521)
GAS SUPPLY
FLUE
INLET
OUTLET
18-1/2
(470)
LIFTING HOLES
(BOTH SIDES)
(FOR RIGGING)
101-1/4
(2572)
SIDE VIEW
15-1/2
(394)
HORIZONTAL
RETURN AIR
OPENING
5-3/8
(137)
30
Important - Do not install
(762)
horizontal economizers
on this opening. Refer to
economizer instructions
SIDE VIEW
for proper installation.
BB
CC
46-7/8
(1191)
1-5/8
(41)
30
(762)
12-1/8
(308)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lgt102hLgt120hLgt150hLct092hLct102hLct120h ... Show all

Table of Contents