Technical Specifications
At least
1.5°
Fig. 1
12
200 Heat
500mm Min
For Servicing
Purposes
270mm
5mm Min
In Operation
3.1.1.

Clearances

1. A flat vertical area is required for the installation of the boiler.
2. These dimensions include the necessary clearances around
the boiler for case removal, spanner access and air movement
(Figs. 1 & 2). Additional clearances may be required for the
passage of pipes around local obstructions such as joists
running parallel to the front face of the boiler.
5mm Min
370mm
5mm Min
190mm
625mm
35mm Min
in Cupboard
120mm Min
Fig. 2
7668909-04 (12/19)