Inspection/Installation - OCEANAIRE 2OACH Series Engineering, Installation And Service Manual

Portable air-cooled heat pump
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS
RECEIVING—INSPECTION
Upon receiving your 2OACH unit, inspect the packaging for any damage. All
units are shipped on a skid, and packaged in a triple-wall carton for added
protection.
BEFORE INSTALLING
Check the unit for any damage. All OceanAire products are thoroughly inspected
at the factory and carefully packaged. If any damage is evident, contact
IMMEDIATELY.
OceanAire
ELECTRICAL REQUIREMENTS
Check the nameplate located on the back of the unit to confirm the proper power
is available for the unit. Refer to "Specifications" section for voltage and
amperage requirements. For proper NEMA receptacles, refer to "Electrical
service plug configuration". When using extension cords, use the proper gauge
cord, and check cord voltage to the unit.
TIME DELAY FUSES/CIRCUIT BREAKERS ARE RECOMMENDED
WARNING
—OPERATING THE UNIT ON IMPROPER
VOLTAGE WILL VOID THE WARRANTY
ACCESSORIES
Verify that all accessories are correct for the model, and are installed in
accordance with all instructions.
START-UP
Install the unit in accordance with all local and state building codes, and install
all accessories. Allow for a clearance around the unit for future maintenance
and/or service. Level unit and lock casters, when available. Connect power and
test the LCDI on the power cord (if available). Power up unit, via thermostat and
check for proper operation. Refer to Thermostat Operation for more details.
16

Advertisement

Table of Contents
loading

Table of Contents