Handling, Moving, Opening The Package Of Diaphragm Pump - Ranpump F50-AX Operating And Maintenance Manual

Ran 2” diaphragm pump
Table of Contents

Advertisement

3.4. Diaphragm pump main dimensions
Figure 3 – Diaphragm pump main dimensions.

4.0. HANDLING, MOVING, OPENING THE PACKAGE OF DIAPHRAGM PUMP

Handle the pump from manifolds to move. 2 and 3 inch pumps must be handled by at least two
persons.
Hoist the pump using suitable equipment according to the weight shown on the plate
Handle the pump from manifolds to move. Pumps are packed in carton boxes.
Figure 4 – Pump package.
Pump package must be at least 200 grams and produced from the kraft carton. It must be fully
covered with packaging separators.
7

Advertisement

Table of Contents
loading

Table of Contents