4.0. HANDLING, MOVING, OPENING THE PACKAGE OF DIAPHRAGM PUMP

Handle the pump from manifolds to move. 2" and 3" pumps must be handled by at least two
persons.
Hoist (Lift) the pump using suitable equipment to handle the weight shown on the Pump Name Plate
Pumps are packed into carton boxes as shown below.
"
Figure 4 – Pump package
Pump package must be at least 200 grams and produced from the kraft carton. It must be fully
covered with packaging separators.