Dual-Epas Two-Post Center-Mount Installation - Dell PowerSwitch N3200-ON Series Installation Manual

Hide thumbs Also See for PowerSwitch N3200-ON Series:
Table of Contents

Advertisement

Dual-EPAs two-post center-mount installation

To install two EPA power adapter holders in a center-mount two-post rack:
NOTE:
This installation instruction procedure applies to the N3208PX-ON switch only.
NOTE:
For this installation, you need two-rack units of space in your mounting rack. Install the switch in the bottom portion
of the two-rack units and keep the top portion open.
1. Align the mushroom heads on one power adapter holder with the two cutouts on the second power adapter holder and slide
together.
2. Secure the two power adapter holders together with four screws—two at the front and two at the back of the assembly.
3. Install the two EPAs in your power adapter assembly and secure with metal straps and screws.
For EPA installation instructions, see
4. Align the right L-bracket with the mushroom heads on the right side of the assembly.
Face the L-bracket flange towards the rear of the assembly.
5. Secure the left L-bracket with four screws.
54
External power adapter
Power adapter holder
assembly.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerswitch e3200-on series

Table of Contents