Two-Post Center-Mount Installation - Dell EMC PowerSwitch S4200-ON Series Setup Manual

Table of Contents

Advertisement

Figure 4. Two-post flush-mount installation
2. Attach one rail to the front post flange with two user-supplied screws, item 2.
3. Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post flange with two
user-supplied screws, item 3.
4. Repeat this procedure for the second rail.

Two-post center-mount installation

NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
1. Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post flange with two
user-supplied screws, item 1.
12
S4200-ON Series Installation

Advertisement

Table of Contents
loading

Table of Contents