ProForm IFIT COACHLINK E9.0 User Manual page 10

Table of Contents

Advertisement

5. Tip: Avoid pinching the Upper Wire (110).
Have a second person hold the Upright (4) on
the Frame (1).
Tip: Two M10 x 25mm Screws (92) are
preattached to the Frame (1).
Attach the Upright (4) to the Frame (1) with two
additional M10 x 25mm Screws (92); do not
fully tighten the Screws yet.
6. Locate the wire tie (A) in the lower end of the
Upright (4). Tie the wire tie to the Upper Wire
(110) as shown. Then, pull the upper end of the
wire tie until the Upper Wire is routed through
the Upright.
Tip: To prevent the Upper Wire (110) from
falling into the Upright (4), secure the Upper
Wire with the wire tie (A).
5
110
6
A
A
110
10
Avoid pinching the
Upper Wire (110)
92
4
92
1
4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ifit pfel59718.4

Table of Contents