Installation; General Operating Conditions - Miele PDW 909 GB Operating And Installation Instructions

Commercial washer-dryer stack
Table of Contents

Advertisement

To avoid the risk of frost damage, the washer-dryer stack must not
be located in rooms which may be subject to very low temperat-
ures.

General operating conditions

This washer-dryer stack is intended only for use in a commercial en-
vironment and must only be operated indoors.
- Ambient temperature: 0-40 °C
- Relative humidity: non-condensing
- Maximum height above sea level of location site: 2000 m
Depending on the nature of the installation site, sound emissions and
vibration may occur.
Tip: Have the installation site inspected and seek the advice of a spe-
cialist in instances where increased noise may cause a nuisance.
Transport the machine on a pallet truck inside the room.
Machines with feet must not be pushed to move them.
This could damage them.
Remove the packaging carefully with a suitable tool.
Lift the individual machines in the washer-dryer stack off the pallet
using a lifting device.

Installation

79

Advertisement

Table of Contents
loading

Table of Contents