Bosch Worcester GREENSTAR CDi CLASSIC REGULAR ErP Series Installation, Commissioning And Servicing Instructions page 40

Wall hung rsf gas fired condensing regular boiler
Table of Contents

Advertisement

SERVICING AND SPARES
Fig. 71 Sensors
40
7. GAS VALVE
▶ Isolate gas supply at boiler gas cock.
▶ Pull out air inlet tube (A).
▶ Undo top gas connection (B) to gas valve.
▶ Undo bottom gas connection (C) to gas valve.
▶ Undo two securing screws (D)on the underside of casing.
▶ Pull valve up and forward out of boiler.
▶ Disconnect electrical connections.
▶ Replace valve with new seals and check for gas soundness.
3.
Fig. 72 Gas valve removal
8. Siphon/condensate trap
1. Pull condensate pipe out of the adaptor.
2. Remove trap from boiler.
▶ Clean trap and check that the connection to the heat exchanger is
▶ Fill the condensate trap with approximately 1/4 litre of water and
4.
5.
Fig. 73 Siphon removal
6 720 812 174-20.1O
The valve will require setting, follow procedure "Setting
the gas/air ratio" in the gas conversion section.
7.
A
C
clear.
refit in reverse order.
2.
1.
B
6 720 812 174-25.1O
6 720 812 174-24.1O
6 720 815 723 (2015/05)

Advertisement

Table of Contents
loading

Table of Contents