Installation; Unpacking Wall Frame And Ancillary Items - Bosch Worcester GREENSTAR CDi CLASSIC REGULAR ErP Series Installation, Commissioning And Servicing Instructions

Wall hung rsf gas fired condensing regular boiler
Table of Contents

Advertisement

4

INSTALLATION

NOTICE: All the previous Pre-Installation sections
must be read and requirements met before starting
boiler or flue installation.
4.1

Unpacking wall frame and ancillary items

LIFTING AND CARRYING PRECAUTIONS:
WARNING:
▶ Lift only a manageable weight, or ask for help.
▶ When lifting the boiler, bend the knees, and keep the
back straight and feet apart.
▶ Do not lift and twist at the same time.
▶ Lift and carry the boiler close to the body.
▶ Wear protective clothing and gloves to protect from
any sharp edges.
IMPORTANT HANDLING INSTRUCTIONS
• It is advised that two people are used to carry the carton from the van
to the point of delivery.
• Once the carton has been delivered, the top of the carton is opened.
If a sharp implement is used make sure the carton is not pierced and
that the implement is used in such a way so that it may not cause
personal injury. All sharp objects must be covered or the blade
retracted after use and put away in a safe place.
1. The upper carton cover [14] and support [13] are now removed
with the components (bottom panel [12], pre-plumbing manifold
with water and gas connections [11], hardware packs x2 [4] and
[5], documentation set [6], hanging bracket [3]).
2. Remove the flow [7] and return pipes [8] and [9].
3. The boiler wall mounting plate [2] can now be pulled out.
Additional requirements for roof space installation:
• The boiler should be first unpacked before ascending ladder to loft
space.
• Two sets of steps should be used.
• Two people should share the lifting of the boiler up to the loft hatch,
where the boiler is entered into the loft space tilted and slid on its
back into the loft.
Once the appliance is removed from its packaging check the contents
against the packing list.
NOTICE: Before installing appliance ensure system
has been cleaned as explained on page 8.
6 720 815 723 (2015/05)
8
6
2.
7
1.
13
10
3
4
5
9
Fig. 24 Contents
[1]
Carton
[2]
Wall mounting plate
[3]
Hardware pack 1
[4]
Hardware pack 2
[5]
Literature pack
[6]
Flow pipe
[7]
Return pipe 1
[8]
Return pipe 2
[9]
Pre-plumbing manifold with water and gas connections
[10] Bottom panel
[11] Upper carton support (polystyrene)
[12] Carton cover
[13] ErP energy label
INSTALLATION
3.
2
12
11
1
6 720 815 723-01.1O
19

Advertisement

Table of Contents
loading

Table of Contents