2
Do not lift by the
top case panel
Fig. 30 Hang the boiler
3. Lower the control panel into the service position by releasing the
white catch on the retaining bracket.
4. Make connections to the heating system.
▶ Connect the gas supply to the boiler gas cock 22mm compression
fitting.
A
Fig. 31 Connections
6 720 815 723 (2015/05)
Handling hole
(both sides)
6 720 815 723-04.1O
B
C
INSTALLATION
23