Carrier Performance Edger Thermidistat Control TP-NRH01-B Installation Instructions Manual page 17

Table of Contents

Advertisement

6. Match and connect equipment wires to proper terminals of each connector
block, being careful not to over tighten the screws. Correct polarity must be
observed when connecting the two wires from the Equipment Control Mod-
ule to the Thermidistat Control mounting base. If wires are connected incor-
rectly, the Display Module will not operate. See Fig. 8, 9 and 10.
Fig. 8 - Control Module Wiring Guide
Red is V+
S
Black is Vg
S
15
A08072

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents