Fanimation Kute FPD8534 Series Manual page 8

Table of Contents

Advertisement

Available languages

Available languages

How to Assemble Your Ceiling Fan (Continued)
6. Reinstall the hanger ball on the downrod as follows.
Route the brown, blue, red, gray, yellow wires and
safety cable through the hanger ball. Position the pin
through the two holes in the downrod and align the
hanger ball so the pin is captured in the groove in the
top of the hanger ball. Pull the hanger ball up tight
against the pin. Securely tighten the set screw in the
hanger ball. A loose set screw could cause fan
wobble. (Figure 6)
7. Cut off excess lead wire approximately 6 to 9 inches
above top of the downrod. Strip insulation off 1/2 inch
from the end of each lead wire. (Figure 7)
CAUTION
All set screws must be checked, and retightened where
necessary before installation.
8.
Remove one of the two shoulder screws in the
hanger bracket and retain the screw for later. Loosen
the second shoulder screw without fully removing it.
(Figure 8)
Hanger Bracket
8
Figure 6
Figure 7
Figure 8

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Kute fpd8534bsbl

Table of Contents