DEALER PRE-DELIVERY CHECKLIST
AFTER COMPLETION, DEALER SHOULD REMOVE AND RETAIN FOR RECORDS
After the Manure Spreader has been completely set up, check to be certain it is in correct operating
order before delivering to the customer. The following is a list of points to inspect. Check off each
item as you have made the proper adjustments and found the item operating satisfactorily.
Manure spreader was not damaged in shipment. Check for dents and loose or missing
parts. Report damage immediately to H&S Manufacturing Co., Inc.
All bolts and fasteners are tight.
Manure spreader has been correctly assembled according to instructions in this manual.
All grease fittings have been lubricated. Gearbox is filled to proper level.
Guards and shields are secure.
Wheels are properly mounted to torque specifications.
Tires are inflated to correct pressure.
Drive chain tension and alignment is correct.
Decals are in place and legible.
Main apron chains are adjusted properly.
Connect the manure spreader to a proper horsepower tractor and attach the PTO. Run the
manure spreader and make sure all components operate properly.
PTO guard turns freely.
Main apron operates smoothly.
Implement and all components are functioning properly.
Model Number
Dealer's Name
Inspection Date
Signature of Pre-Delivery Inspector
Serial #
-5-