Nobis H10 V SHAPE Instructions For Installation, Use And Maintenance Manual page 40

Table of Contents

Advertisement

Use and Maintenance Manual model "H10 V SHAPE - H12 V SHAPE"
OPERATING PROCEDURE:
Open the door positioned under the fire door, as in
the figure below:
Open the ash pan using the handle, as in the figure
below:
Remove the ash pan and empty it, as in the figure
below:
CLEANING CYCLES TABLE
Below, the control and/or maintenance intervention
are summarised which are indispensable for
correct appliance operation.
PARTS/FREQUENCY
Ash pan (approx. time)
Glass
Extraction pipe *
Door seal/ash pan*
Tube bundle scraper
(where present)
Chimney flue
Combustion chamber
Vacuum pellet tank
Electromechanical components*
LEGEND:
*
- operations which can be carried out
by a technician authorised by the manufac-
turer;
DD - day/s
SE
- season
MAINTENANCE
DATE
INTERVENTION CARRIED OUT
40
ENGLISH
TIME
7 DD
2-3 DD
1 SE
1 SE
7 DD
1 SE
2-3 DD
30 DD
1 SE

Advertisement

Table of Contents
loading

This manual is also suitable for:

H12 v shape

Table of Contents