Download Print this page

Baxton Studio EASTON-QB Assembly Instruction page 2

Advertisement

STEP 5
Attach each Footboard Legs (7) to the bottom of the Footboard Cushion (6)
by securing with 3 Allen Bolts (B) per leg using L-Key (J).
7
STEP 7
Attach Side Rail to the Headboard Leg (2) & (3) & Footboard Cushion (6). Aligning holes and securing with
2 Allen Bolts (A) per each and using L-Key (K).
Do not fully tighten bolts for this step.
9
8
7
6
6
7
B
J
A
8
9
6
STEP 6
Attach Support Legs (12) to Slat (11) by securing with 1 Allen Bolt (D) per support leg using L-Key (I).
11
STEP 8
Attach Slat (11) to side rail by securing with 1 Screw (G) per each side.
Tighten all screws using phillips head screwdriver (NOT INCLUDED).
K
9
I
12
12
8
11
11
9
11
11
11
8
D
11
G
ASSEMBLY
COMPLETED

Advertisement

loading