Download Print this page

Advertisement

Quick Links

x2
2mm Drill bit

Advertisement

loading
Need help?

Need help?

Do you have a question about the 01DTPRMSHDB0808DDOP-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 01DTPRMSHDB0808DDOP-V1

  • Page 1 2mm Drill bit...
  • Page 3 Before assembly Door Cloaking Strip 27x44x1670mm QTY 1 please make sure you have a F2744-1670MM suitable base ready to erect your building Door Strip 12x45x1449mm QTY 1 S1245-1449MM Door Strip 12x45x1772mm QTY 2 S1245-1772MM MADE IN GREAT BRITAIN Window Strip 12x56x1037mm QTY 2 Overall Dimensions: Base Dimensions: S1256-1037MM...
  • Page 4 Pre Assembly Truss Brace 27x44x1640mm QTY 2 F2744-G-1680MM Before assembling remove the transportation blocks from the bottom of each panel. Door Blocks 27x44x150mm QTY 2 Take care removing the blocks as to not damage F2744-150MM the panels. Tap with a at headed screwdriver and hammer.
  • Page 5 Step 1 Step 3 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed- No.1 QTY 4 Locate the second oor assembly Place the oor panels (No.1) onto a along side the rst oor assembly. rm and level base. Ensure the base has suitable drainage, free from areas Secure to the oor using 2x40mm where standing water can collect.
  • Page 6 Step 5 Step 7 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed- No.2 QTY 1 Parts Needed- No.4 (or 3) QTY 1 - No.3 (or 4) QTY 1 BACK BACK Locate the Second Window Panel (No.4) Locate the Second Back Panel (No.2) and (or Side Panel) onto the oor, ensuring Side panel (No.3) (or Window Panel) onto...
  • Page 7 Step 9 Step 10 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed- No.21 QTY 2 Parts Needed- No.7 QTY 2 - No.22 QTY 1 - No.8 QTY 2 - No.23 QTY 1 SIDE Lay the Gable tops (No.7 & 8) along side PANEL Locate the Top Door Framing (No.21 &...
  • Page 8 Step 12 Step 14 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed- No.28 QTY 2 Parts Needed- No.31 QTY 2 Locate the Gable Strips (No.28) onto the Measure and mark 42mm from the top corner of the truss. join of the Gable Tops and front/back panels.
  • Page 9 Step 15 Step 17 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed- No.12 QTY 4 Parts Needed- No.12 QTY 4 - No.40 QTY 2 Place the Bottom roof panels (No.12) Locate the Bottom roof panels on top of the gables and truss, (No.12) and secure the roof panels ensuring they are correctly orientated together using a U channel (No.40)
  • Page 10 Step 21 Step 19 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed- No.11 QTY 4 Further secure each Roof in place using 4x30mm screws, ensuring they Place the Top Roof Panels (No.11) are no more than 300mm apart. Make on top of the gables and truss, sure to screw through the cladding ensuring...
  • Page 11 Step 23 Step 25 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed- No.5 QTY 2 Make sure that the Bottom Door Framing - No.33 QTY 6 (No.23) is ush with the framing within the front panels. Fix the Bottom Door Fix 3 Hinges (No.33) to each Door Framing to the oor ensuring that you go (No.5) securing with 4x30mm screws...
  • Page 12 Step 26 Step 28 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed- No.15 QTY 1 Parts Needed- No.39 QTY 2 - No.30 QTY 2 Align the lock (No.39) to the door, Place the Door Blocks (No.30) onto the ensuring equal spacing across the top of the door framing and ensure that doors and in line with the door framing.
  • Page 13 Step 30 Step 31 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed- No.13 QTY 2 Parts Needed- No.32 QTY 2 - No.18 QTY 2 - No.36 QTY 4 Fix the Casement Stay (No.32) to the opening window then align the xings Place the Window Strip (No.18) onto the window panel frame.
  • Page 14 Step 34 Step 33 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed- No.37 QTY 1 Parts Needed- No.25 QTY 4 - No.27 QTY 4 Cut four strips of felt (No.37) measuring Locate the Fascias (No.25 & 27) to 2500mm (L) x 1000mm (W) and place the front and rear of the building, onto the roof.
  • Page 15 It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled. AFTER TREATMENT: score around protective cover on glazing and carefuly peel covering back...

This manual is also suitable for:

01dtprmshdb1008ddop-v2