Download Print this page
Mercia Garden Products 01DTPRMSHPN1208DDOP-V2 Instructions Manual

Mercia Garden Products 01DTPRMSHPN1208DDOP-V2 Instructions Manual

Dip treated premium shiplap pent 12x8 double door opening window

Advertisement

Quick Links

General Instructions
01DTPRMSHPN1208DDOP-V2
DIP TREATED PREMIUM SHIPLAP PENT 12X8 DOUBLE DOOR OPENING WINDOW
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screw-
driver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
LOCATION FOR YOUR GARDEN BUILDING
A minimum of 60cm should be left around the perimeter of your garden building to allow access for maintenance,
annual treatment and to allow air ow around the building.
Where possible you should avoid placing your garden building underneath large trees to prevent the tree causing
damage to the building.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions. For the duration of heavy
or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during
excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be
helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine
and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent
the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee.
Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treat-
ment to prevent water ingress
Pressure Treated buildings - Require a waterproof treatment to prevent water ingress
Log Cabins - Are supplied untreated and require a preservative and waterproo ng treatment.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base
dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The cladding
should overlap the base, creating a run o for water. It is also recommended that the oor be at least 25mm above
the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens
products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or
using this product.
Please retain product label and instructions for future reference
x2
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly, you
will need a tape measure to
check dimensions of
components.
**Protim Aquatan T5 (621)**
Your building has been dip treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building has been treated by the
correct application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
REGISTER FOR YOUR
ANTI-ROT
GUARANTEE TODAY
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
Screws & Nails
Bolts
To identify the
xings required
Measure
Measure
for each step use a
overall
under the
length
measuring tape.
head
PLEASE SCAN HERE:
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 01DTPRMSHPN1208DDOP-V2 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 01DTPRMSHPN1208DDOP-V2

  • Page 1 It is also recommended that the oor be at least 25mm above the surrounding ground level to avoid ooding. For assistance please contact customer care on: 01636 821215 Mercia Garden Products Limited, TYPES OF BASE Sutton On Trent, - Concrete 75mm laid on top of 75mm hard-core.
  • Page 2 01DTPRMSHPN1208DDOP-V2 Please retain product label and instructions for future reference Overall Dimensions: Width =3567mm Depth = 2484mm Height = 2167mm Base Dimensions: Width = 3506mm Depth = 2350mm Before assembly please make sure you have a suitable base ready to erect your...
  • Page 3: Pre-Assembly

    Please retain product label and instructions for future reference Nail Bag Step 2 Parts needed- No.1 QTY 2 There may be extra screws present in the nail bag Secure the Floor (No. 1) to the assembly 40mm Screw x 32 60mm Bolt x 8 from Step 1, using 8x30mm screws per oor.
  • Page 4 Please retain product label and instructions for future reference Step 4 Step 6 *Inside View* Parts needed- No.2 QTY 1 Parts needed - No.5 QTY 1 No.3 QTY 2 No.10 QTY 1 No.30 QTY 6 Place the Left Gable 2085mm (No.10) onto the oor next to the Fix the T Hinges (No.30) onto the Left Gable 1931mm (No.9) and x...
  • Page 5 Please retain product label and instructions for future reference Step 8 Step 10 IMPORTANT: Pre-drill before xing screws. Parts needed - No.2 QTY 1 Align the assembled Ridge Bars No.12 QTY 1 (No.15) with the framing of the Place the assembled Door panel (No.2) Gables as shown.
  • Page 6 Please retain product label and instructions for future reference Step 14 Step 12 Parts needed- No.8 QTY 4 Fix the Roofs (No.8) to the top of Place the assembled roof the building, ensuring the side panels (No.8) onto the top of edges are ush with the building the building.
  • Page 7 Please retain product label and instructions for future reference Step 16 Step 18 Once the roof is xed, attach the Parts needed - No.13 QTY 1 No.21 QTY 1 building to the oor with 50mm screws. No.28 QTY 2 Opening Window Ensure the screws go through the Place the Window Cover Trim 30mm...
  • Page 8 Please retain product label and instructions for future reference Step 19 Step 21 Parts needed - No.35 QTY 1 Parts needed - No.33 QTY 1 Fix the casement stay (No.35) to the Cut the Felt (No.33) into 3 sheets window and then align the xings to measuring: the window panel framing.
  • Page 9 Please retain product label and instructions for future reference Step 22 Step 24 Parts needed- No.34 QTY 1 Parts needed- No.25 QTY 4 No.26 QTY 4 Align the lock (No.34) to the door, Fix the Fascias (No.26) to the front ensuring equal spacing between the cover trims and across the and back of the building and secure...